Technical Debt

Technical Debt. CS 510 Software Engineering Supannika Koolmanojwong. Outline. Total Cost of Ownership Technical Debt. What are the cost of a software?. Think about the whole life cyle. Total cost of ownership.

thuyet
Download Presentation

Technical Debt

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical Debt CS 510 Software Engineering Supannika Koolmanojwong

  2. Outline Total Cost of Ownership Technical Debt

  3. What are the cost of a software? Think about the whole life cyle

  4. Total cost of ownership • a financial estimate whose purpose is to help consumers and enterprise managers determine direct and indirect costs of a product or system. • including the costs to research, develop, acquire, own, operate, maintain, and dispose of a system

  5. Potential total cost of ownership • HW and SW • Network • Server • Workstation • Installation & integration • Purchasing research • Warranties and licenses • License tracking - compliance • Migration expenses • Risks: susceptibility to vulnerabilities, availability of upgrades, patches and future licensing policies, etc. • Infrastructure • Electricity • Testing costs • Downtime, outage and failure expenses • Diminished performance • Security (including breaches, loss of reputation, recovery & prevention) • Backup and recovery process • Technology training • Audit • Insurance • IT personnel • Replacement • Future upgrade or scalability expenses • Decommissioning

  6. Relative* Total Ownership Cost (TOC)For single system life cycle (TOC-SS) ~5% architecture investment ~5% architecture investment ~25% architecture investment * Cumulative architecting and rework effort relative to initial development effort

  7. CodeSmell Deficit programming Code Debt Technical Debt Software Decay coined by Ward Cunningham Design Debt Technical Inflation

  8. Technical DebtBy Ward Cunningham http://www.youtube.com/watch?v=pqeJFYwnkjE&feature=player_embedded#!

  9. Technical Debt “is a measure of how untidy or out-of-date the development work area for a product is” Not the deferred requirements http://www.c2.com/cgi/wiki?TechnicalDebt

  10. Technical Debt http://petdance.com/perl/technical-debt “I don’t know what happened, I just changed one line” “We can’t upgrade, It will break” “We can’t upgrade the code, we don’t have time” “We can’t upgrade the code, no one understands it” “Just put in the comment XXX, we will do it later” “Just put in the TODO comment”

  11. Financial debt vsTechnical Debt http://martinfowler.com/bliki/TechnicalDebt.html

  12. http://pkruchten.files.wordpress.com/2011/10/kruchten-111027-techdebt.pdfhttp://pkruchten.files.wordpress.com/2011/10/kruchten-111027-techdebt.pdf

  13. Technical Debt • intentional technical debt • cost to taking short cuts • unintentional technical debt • making mistakes • Conscious decision to optimize for the “present” rather than the “future” • cost of not dealing with these short cuts and mistakes will increase over time.  Read more: http://www.javacodegeeks.com/2012/02/technical-debt-how-much-is-it-really.html#ixzz1phjvB5A9

  14. Common causes of technical debt Business pressures Lack of process or understanding Lack of building loosely coupled components (hard-coded) Lack of documentation Parallel Development Delayed Refactoring http://en.wikipedia.org/wiki/Technical_debt

  15. Technical DebtArchitecture or the platform technology mistake Read more: http://www.javacodegeeks.com/2012/02/technical-debt-how-much-is-it-really.html#ixzz1phnGFlUV Scalability, reliability Foundations are poorly design you don’t find out until too late (operations phase) no choice but to start again or rewrite big chunk to keep it working

  16. Technical DebtError-prone code Read more: http://www.javacodegeeks.com/2012/02/technical-debt-how-much-is-it-really.html#ixzz1phnGFlUV http://petdance.com/perl/technical-debt/technical-debt.007.html “ .. If I change X, it is going to break Y, I think ..” “ Don’t touch that code, last time we did, we spent a week fixing it…” 20% of the code where 80% of bugs are found Hard to understand Dangerous to change because done poorly one in the first place Not rewriting this code is one of the most expensive mistakes that developers make

  17. Technical DebtNot easily tested Read more: http://www.javacodegeeks.com/2012/02/technical-debt-how-much-is-it-really.html#ixzz1phnGFlUV “ .. I thought we had a test for that ..” Don’t have good automated tests Tests keep falling apart when you change the code Testing costs tend to go up over time as you write more code

  18. Technical DebtCode that mysteriously works Read more: http://www.javacodegeeks.com/2012/02/technical-debt-how-much-is-it-really.html#ixzz1phnGFlUV nobody is sure how or why Might be written by the geek who left the company if nobody on the team understands it, it’s a time bomb

  19. Technical DebtOthers Read more: http://www.javacodegeeks.com/2012/02/technical-debt-how-much-is-it-really.html#ixzz1phnGFlUV • Forward and backward compatibility • Short term debt • Duplicate, copy-and-paste code • How many ? Trackable ? • Hard coding • Out of date documentation • “We just lost the drive, where are the backups” • If nobody is using it, get rid of it. If people are using it, why isn’t it up to date?

  20. Technical Debt Cost average $3.61 to $5.42 per line of code. Example of Technical Debt Calculation http://docs.codehaus.org/display/SONAR/Technical+Debt+Calculation

  21. Technical Debt Observations“Agile Project Management”, Jim Highsmith, second edition

  22. Committed Costs 95% 85% 500X-1,000X 70% Cost to Extract Defects 20X-100X 3X-6X The Cost of Undetected Defects Operation  Disposal 100% 100% 90% 80% 70% 60% Production/Test Cumulative Percentage of Life-Cycle Cost 50% 50% 40% 30% Development 20% Design 20% Concept 15% 10% 8% 0% Reference: Defense Systems Management College (DAU) Time

  23. Development Cost(Perfect World) % Effort per Phase Analysis Test Integration Design Implementation

  24. Typical Defect Profiles Classification of Defects Design Defects Implementation Defects Integration Defects Analysis Test Integration Design Implementation Defect Insertion Defect detection & Removal

  25. Development Cost(Real World) % Effort per Phase Analysis Test Integration Design Implementation

  26. Development Cost % Effort per Phase Analysis Test Integration Design Implementation Real world Perfect World

  27. Development Cost Technical Debt? Technical Debt? % Effort per Phase Technical Debt? Technical Debt? Analysis Test Integration Design Implementation Real world Perfect World

  28. Development Cost Technical Debt? % Effort per Phase Technical Debt? Analysis Test Integration Design Implementation Real world Perfect World

  29. COTS Integration % Effort per Phase Technical Debt? Analysis Test Integration Design Implementation Real world Perfect World

  30. Technical Debt http://www.youtube.com/watch?v=xyJvDbEjtYw

  31. Fixing technical debt • 80/20 rule • 20% initial build • 80% clean up

  32. Fixing technical debt http://www.javacodegeeks.com/2011/11/dealing-with-technical-debt.html#ixzz1pjQ8bQpF • Big Bang • no new features for a year? Really?  • spend some time cleaning up the mess • Good ? • Dedicated Team • Have another team dedicated • Good ? 80/20 rule ? • Boy Scout • remove technical debt little and often • If no tests, add some. If poor test, improve them. If bad code, refactor it • The boy scout rule – leave the camp cleaner than you found it

  33. Fixing technical debt • Think time & risk & $$$ • No gold-plating • Unnecessary task that no one wants • BigResearchUpFrontvsBigDesignUpFront

  34. Technical Debt vs Agile : Bad http://www.startuplessonslearned.com/2009/07/embrace-technical-debt.html • Quick and dirty approach • Scalability vsDoTheSimplestThingThatCouldPossiblyWork • Just-in-time Scalability • change the architecture in response to actual customer demand • Wasted Code

  35. Technical Debt vs Agile : Good http://www.startuplessonslearned.com/2009/07/embrace-technical-debt.html Get feedback faster Smaller batches

  36. Technical Debt vs Lean : Good http://www.startuplessonslearned.com/2009/07/embrace-technical-debt.html Less waste, less debt Just-in-time nature

  37. Technical Debt vs NDI : Bad http://www.startuplessonslearned.com/2009/07/embrace-technical-debt.html • Product Development Leverage • Your product is fortified by others • Open-source, COTS, Services • Pros: Faster • Cons • Code understanding • Different coding styles, architecture, quality • No direct control

  38. http://pkruchten.files.wordpress.com/2011/10/kruchten-111027-techdebt.pdfhttp://pkruchten.files.wordpress.com/2011/10/kruchten-111027-techdebt.pdf

  39. http://pkruchten.files.wordpress.com/2011/10/kruchten-111027-techdebt.pdfhttp://pkruchten.files.wordpress.com/2011/10/kruchten-111027-techdebt.pdf

  40. http://pkruchten.files.wordpress.com/2011/10/kruchten-111027-techdebt.pdfhttp://pkruchten.files.wordpress.com/2011/10/kruchten-111027-techdebt.pdf

  41. Information Categories - Measurable Concepts Product Quality • Functional Correctness • Supportability - Maintainability • Efficiency • Portability • Usability • Dependability - Reliability • Security - Safety Process Performance • Process Compliance • Process Efficiency • Process Effectiveness Technology Effectiveness • Technology Suitability • Technology Maturity • Technology Volatility • Technology Adoption Customer Satisfaction • Customer Feedback • Customer Support Schedule and Progress • Milestone Completion • Work Unit Progress • Work Backlog • Incremental Capability Resources and Cost • Financial Performance • Personnel Effort • Environment and Support Resources Size and Stability • Physical Size and Stability • Functional Size and Stability Source: “Introduction to PSM Course, Version 7.0”, July 30,2012, Portsmouth, VA Bob Epps, Technical Debt Workshop, PSM Conference

  42. Information Categories - Measurable Concepts Product Quality • Functional Correctness • Supportability - Maintainability • Efficiency • Portability • Usability • Dependability - Reliability • Security - Safety Process Performance • Process Compliance • Process Efficiency • Process Effectiveness Technology Effectiveness • Technology Suitability • Technology Maturity • Technology Volatility • Technology Adoption Customer Satisfaction • Customer Feedback • Customer Support Schedule and Progress • Milestone Completion • Work Unit Progress • Work Backlog • Incremental Capability Resources and Cost • Financial Performance • Personnel Effort • Environment and Support Resources Size and Stability • Physical Size and Stability • Functional Size and Stability Measurable Concept Areas where “Intentional” Technical Debt may be found Source: “Introduction to PSM Course, Version 7.0”, July 30,2012, Portsmouth, VA Bob Epps, Technical Debt Workshop, PSM Conference

  43. Activities during Operations & Maintenance(O&M) If each RFC has equal complexity you might expect this % Effort per Phase % Effort per Phase % Effort per Phase System Complexity RFC #2 RFC #3 RFC #1 Imp Imp Imp Test Test Test Integ Integ Integ Analysis Analysis Analysis Design Design Design Time Source: Bob Epps, Technical Debt Workshop, PSM Conference 2012

  44. Activities during Operations & Maintenance(O&M) Even if each RFC has different complexity , it still would be manageable. If maintainability is measured by the number of systems components changed for an RFC what is the ideal number of components changed? What dictates this number? System Complexity % Effort per Phase % Effort per Phase % Effort per Phase RFC #2 RFC #3 RFC #1 Imp Imp Imp Test Test Test Integ Integ Integ Analysis Analysis Analysis Design Design Design Time Source: Bob Epps, Technical Debt Workshop, PSM Conference 2012

  45. Activities during Operations & Maintenance(O&M) However, experience shows that even when the RFCs have the same complexity the “aggregate” complexity of the system causes side effects which complicate future RFCs. RFC #3 System Complexity % Effort per Phase % Effort per Phase % Effort per Phase RFC #2 How is the phenomenon managed? RFC #1 Imp Imp Imp Test Test Test Integ Integ Integ Analysis Analysis Analysis Design Design Design Time Source: Bob Epps, Technical Debt Workshop, PSM Conference 2012

  46. Activities during Operations & Maintenance(O&M) System Complexity % Effort per Phase % Effort per Phase % Effort per Phase % Effort per Phase % Effort per Phase % Effort per Phase When overlapping RFCs occur, coupled with side effects the control of the baseline(s) are in jeopardy . RFC #1 RFC #3 RFC #2 RFC # N-1 RFC # N RFC #4 Imp Imp Imp Imp Imp Imp Test Test Test Test Test Test Integ Integ Integ Integ Integ Integ Analysis Analysis Analysis Analysis Analysis Analysis Design Design Design Design Design Design Time Source: Bob Epps, Technical Debt Workshop, PSM Conference 2012

  47. The bottom line • Trade off between • Technical Debt • Flexibility (Design for Reuse) • Expedition

  48. References http://pkruchten.files.wordpress.com/2011/10/kruchten-111027-techdebt.pdf