Status of the Proposed Scale Up of the Tanzania Productive Social Safety Net (PSSN)

Status of the Proposed Scale Up of the Tanzania Productive Social Safety Net (PSSN) . Briefing to the DPG August 13, 2013 . Way Forward. A mission is planned for September 16-27 Focus will be on: meeting with DPs regarding the options

thyra
Download Presentation

Status of the Proposed Scale Up of the Tanzania Productive Social Safety Net (PSSN)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the Proposed Scale Up of the Tanzania Productive Social Safety Net (PSSN) Briefing to the DPG August 13, 2013

  2. Way Forward • A mission is planned for September 16-27 • Focus will be on: • meeting with DPs regarding the options • Requesting DPs firming up their interest in contributing to the funding requirements • Meetings with Government to discuss: • sustainability of the program and how much the Government will contribute • get agreement on scaling up to 1.2 households which is 15% of the population

  3. Way Forward (cont….) • TASAF is working on costing of three options to be presented to Government and the DPs • TASAF will engage the wider stakeholders at a workshop • By the end of the mission, a presentation of the final three options will be made to Government for a final decision

  4. Way Forward (Cont…) • Operationally, TASAF is currently working on the roll-out plan by: • building capacity of the districts • piloting with electronic transfers • procuring consultants, equipment and new staff as per current PSSN

  5. Thank you for your attention