50 likes | 164 Views
Status of the Proposed Scale Up of the Tanzania Productive Social Safety Net (PSSN) . Briefing to the DPG August 13, 2013 . Way Forward. A mission is planned for September 16-27 Focus will be on: meeting with DPs regarding the options
E N D
Status of the Proposed Scale Up of the Tanzania Productive Social Safety Net (PSSN) Briefing to the DPG August 13, 2013
Way Forward • A mission is planned for September 16-27 • Focus will be on: • meeting with DPs regarding the options • Requesting DPs firming up their interest in contributing to the funding requirements • Meetings with Government to discuss: • sustainability of the program and how much the Government will contribute • get agreement on scaling up to 1.2 households which is 15% of the population
Way Forward (cont….) • TASAF is working on costing of three options to be presented to Government and the DPs • TASAF will engage the wider stakeholders at a workshop • By the end of the mission, a presentation of the final three options will be made to Government for a final decision
Way Forward (Cont…) • Operationally, TASAF is currently working on the roll-out plan by: • building capacity of the districts • piloting with electronic transfers • procuring consultants, equipment and new staff as per current PSSN