20 likes | 149 Views
Status of proposed experiments. Approved by INTC. New. # To be studied in detailed proposals. A tentative scenario for 2011/2012. Approved by INTC. New. $ Runs in parallel with PPAC
E N D
Status of proposed experiments Approved by INTC New # To be studied in detailed proposals
A tentative scenario for 2011/2012 Approved by INTC New $ Runs in parallel with PPAC # Runs in parallel with C6D6 measurements (Would be optimum to run all C6D6 meas. consecutively) [Max. 8e18 in 2011] ? To be confirmed with a detailed proposal *A new MGAS(n,a) measurement could be scheduled in parallel with PPAC in 2012 [16O(n,a) 2-20 MeV in HRPL, and many others for astrophysics, see Franz’s list]. Beyond 2012 it would still remain: capture on 5x,5xFe, 6x,6xNi, 243Am, plus new proposals