1 / 2

Status of proposed experiments

Status of proposed experiments. Approved by INTC. New. # To be studied in detailed proposals. A tentative scenario for 2011/2012. Approved by INTC. New. $ Runs in parallel with PPAC

zeroun
Download Presentation

Status of proposed experiments

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of proposed experiments Approved by INTC New # To be studied in detailed proposals

  2. A tentative scenario for 2011/2012 Approved by INTC New $ Runs in parallel with PPAC # Runs in parallel with C6D6 measurements (Would be optimum to run all C6D6 meas. consecutively) [Max. 8e18 in 2011] ? To be confirmed with a detailed proposal *A new MGAS(n,a) measurement could be scheduled in parallel with PPAC in 2012 [16O(n,a) 2-20 MeV in HRPL, and many others for astrophysics, see Franz’s list]. Beyond 2012 it would still remain: capture on 5x,5xFe, 6x,6xNi, 243Am, plus new proposals

More Related