1 / 15

E3 Network Results IVS General Meeting January 11, 2006

E3 Network Results IVS General Meeting January 11, 2006. Background. E3 Network was designed to provide an additional day to VLBI EOP determination Uses the S2 recorder and Data Acquisition System (2 Frequency-Agile Baseband Converters) Operates at 128 Mbps, 18 Channels (10 X, 8 S)

tien
Download Presentation

E3 Network Results IVS General Meeting January 11, 2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E3 Network ResultsIVS General MeetingJanuary 11, 2006

  2. Background • E3 Network was designed to provide an additional day to VLBI EOP determination • Uses the S2 recorder and Data Acquisition System (2 Frequency-Agile Baseband Converters) • Operates at 128 Mbps, 18 Channels (10 X, 8 S) • Offers an independent check for systematic differences • 45 Sessions since March, 2002

  3. E3 Network

  4. Scheduling • Complicated by Small dishes • Continuous Tape motion • Typical Session has ~1300 scheduled obs, 400-700 used in analysis • Correlation at 6 station Correlator at Dominion Radio Astronomical Observatory (DRAO)

  5. E3 Contribution to TRF • Adds unique point at CTVASTJ • Bulk of Yellowknife observations • CTVASTJ Position (2004 epoch) determined to: Up: 9 mm, 0.5 mm/yr East: 1 mm, 0.9 mm/yr North: 1 mm, 1.0 mm/yr

  6. Station repeatability

  7. Baseline Repeatability

  8. EOP Comparisons • Comparisons of E3 EOP results against IVS R series are made after all sessions • CALC/SOLVE solution with C04 Series removed • Best E3 sessions compare very well, sessions with station problem indicate network is not robust

  9. Poles

  10. UT

  11. Nutation

  12. EOP Summary

  13. GPS Clock Comparison • Add IGS Final Clock solution for ALGO and KOKEE to E3 delay in E3011 (not IVS database product) • Solved using only Clock offset, or using tight clock constraints

  14. GPS Clock Used in VLBI Solution

  15. Future (VLBI2010) • CTVA victim to XM RFI – Upgrade or Move • PC based replacement for the S2 recorder • Software Correlator License from NICT • Unattended operations at CTVA/Yellowknife

More Related