GSOC Update. GMMSCA Meeting September 25, 2014. Agenda. Summer update SERC audit ECOT update. Summer Update. 2012 was the year of the heat wave 2013 was the year of rain and mild temps 2014 is the year of the winter peak: 9,035 MWh Summer peak: 8,386 MWh on July 2 nd
E N D
GSOC Update GMMSCA Meeting September 25, 2014 Proprietary & Confidential
Agenda Summer update SERC audit ECOT update Proprietary & Confidential
Summer Update • 2012 was the year of the heat wave • 2013 was the year of rain and mild temps • 2014 is the year of the winter peak: 9,035 MWh Summer peak: • 8,386 MWh on July 2nd • Temperature observed: 95º As of August 31st: • 26 days 90º or greater • One day greater than 93º Load management calls • August 7th • August 22nd
Summer UpdateCapacity Actuals 2014 Actuals Proprietary & Confidential
Summer UpdateEnergy • Cumulative Monthly Energy • Energy served through August is: • ≈ 2% less than forecasted • ≈ 7.5% greater than 2013 • Monthly Energy • Energy served for August is: • ≈ 3% less than forecasted • ≈ 8.5% greater than 2013 August data is preliminary
Summer Update • Load Management • Four calls this year for Top 5 purposes • Twice in January • January 7th and 8th • Twice in August • August 7th and 22nd Proprietary & Confidential
Summer Update Load Management Proprietary & Confidential
Summer Update Proprietary & Confidential
Summer Update Proprietary & Confidential
SERC Audit • June Bulk Electric System audit • GSOC responsible for: • 43 standards and 329 requirements • GSOC was audited on: • 20 standards and 40 requirements Proprietary & Confidential
SERC Audit • Outstanding results: • No findings • No possible violations • No enforcement actions • No areas of concerns • No near misses • No recommendations • No suggested areas of improvement Proprietary & Confidential
SERC Audit Risk Assessment of GSOC Proprietary & Confidential
ECOT EMC Customer Outage Tracking (ECOT) Goal is to have EMCs with an outage management system communicating with ECOT in early 2015 Currently have six EMCs integrated Proprietary & Confidential
ECOT • Carroll • Grady • Greystone • Mitchell • Oconee • Walton OMS Vendor (Milsoft) TESTING (14) OMS Vendor (DataVoice) ACTIVE (6) OMS Vendor (Intergraph) TBD (2) OMS Vendor (ABB) TBD (1) Cumulative Outage Count (6 of 38) OMS Vendor (TWACS) TBD(1) OMS Vendor (SEDC) TBD (2) OMS Vendor (Trimble) TBD (1) OMS Vendor (NISC) TBD (1) OMS Vendor (In-House) TBD (2) OMS Vendor (None) TBD (5) OMS Vendor (Excel/Dbase) TBD (3) TBD – TO BE DEVELOPED