IEEE 802.11ah Closing Report for March 2012

IEEE 802.11ah Closing Report for March 2012. Authors:. Date: 2012-3-15. Work continued on specification framework Many straw polls and motions Update to the spec framework adopted 11-11-1137-06-00ah-specification-framework-for-tgah.docx Typo fix on channel model document.

tilden
Download Presentation

IEEE 802.11ah Closing Report for March 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEEE 802.11ah Closing Report forMarch2012 Authors: Date:2012-3-15 David Halasz, Motorola Mobility

  2. Work continued on specification framework • Many straw polls and motions • Update to the spec framework adopted • 11-11-1137-06-00ah-specification-framework-for-tgah.docx • Typo fix on channel model document Activity in TGah David Halasz, Motorola Mobility

  3. Ad hoc sub groups created and leadership established • PHY Ad hoc sub group chairs • Ron Porat • David Xun Yang • Minho Cheung • MAC Ad hoc sub group chairs • Simone Merlin • Yong Liu • Huai-RongShao Activity in TGah David Halasz, Motorola Mobility

  4. Startup ad hocs to create draft text from specification framework Continue work on specification framework Going forward David Halasz, Motorola Mobility

  5. April 11 at 10 AM ET 1 hour • MAC • April 18 at 7 PM ET 1 hour • PHY • May 9 at 10 AM ET 1 hour • Prepare for May face-to-face meeting Teleconferences David Halasz, Motorola Mobility

  6. No update • Internal Task Group Ballot : November 2012 • Initial Letter Ballot : March 2013 • Initial Sponsor Ballot : March 2014 • EC Approval : January 2015 • Revcom Approval : March 2015 Timeline David Halasz, Motorola Mobility