1 / 6

IEEE 802.11ah Closing Report for September 2013

IEEE 802.11ah Closing Report for September 2013. Authors:. Date: 2013-9-19. Call for Comments on Draft 0.1 received 988 comments Finished addressing comments received during Call for Comments 9. 11-13-0701-08-00ah-comment-collection-9-comments.xlsx

hadar
Download Presentation

IEEE 802.11ah Closing Report for September 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEEE 802.11ah Closing Report forSeptember2013 Authors: Date:2013-9-19 David Halasz (Qualcomm)

  2. Call for Comments on Draft 0.1 received 988 comments • Finished addressing comments received during Call for Comments 9. • 11-13-0701-08-00ah-comment-collection-9-comments.xlsx • Task Group motion passed to proceed to Letter Ballot Activity in TGah David Halasz (Qualcomm)

  3. Start initial Letter Ballot and start addressing comments in November. Going forward David Halasz (Qualcomm)

  4. Motion: • Having approved changes to TGah Draft 0.2, as defined in the following documents, • 11-13-1181-01-00ah-PHYMotions2013-09-18.xlsx • 11-13-1194-01-00ah-comment-collection-9-mac-motion-9-10.xlsx • 11-13-0898-01-00ah-ack-policy-for-short-mac-header.docx • 11-13-1207-01-00ah-partial-aid-color-bits.pptx • 11-13-1227-00-00ah-phy-motions-2013-09-19.xlsx • 11-13-1072-02-00ah-comments-and-resolutions-obss-max-idle-period.doc • 11-13-1228-00-00ah-comment-collection-9-mac-motion-11.xlsx • 11-13-1088-02-00ah-coexistance-assurance.doc • 11-13-1234-00-00ah-comment-collection-9-mac-motion-12.xlsx • Instruct the editor to prepare TGah Draft 1.0, and • Approve a 30 day Working Group Technical Letter Ballot asking the question “Should TGah Draft 1.0 be forwarded to Sponsor Ballot?” • [Moved by David Halaszon behalf of TGah • TGahvote: • Moved: Zander Lei, Seconded: Ron Murias, Result: 27-0-0] WG LB motion David Halasz (Qualcomm)

  5. November 7th, 10AM ET for 2 hours Please note that this is a Thursday Teleconference David Halasz (Qualcomm)

  6. Current • Internal Task Group Ballot : May 2013 • Initial Letter Ballot : September 2013 • Initial Sponsor Ballot : March 2015 • EC Approval : January 2016 • Revcom Approval : March 2016 Timeline – No change David Halasz (Qualcomm)

More Related