An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bidding When, Who and How

  2. When to Bid During the CAP Implementation Phase • No UCR and over the duration of the phase costs over $1,000 exclusive of mark-up

  3. When to Bidcontinued During any Phase • For any activity as directed by DEQ • To demonstrate a reasonable rate that is higher than a DEQ established UCR for a Task or Material Code.

  4. When to Bidcontinued When transporting & disposing of more than 250 tons of contaminated soil

  5. Who - the Primary Consultant • A Consulting Firm MAY NOT bid on scopes of work at sites where the Firm is the primary consultant!

  6. Bidding Requirement & Procedures • Freight, Shipping and Applicable Taxes as Line Item costs within the Scope of Work

  7. Bidding Requirement & Procedures Obtain a minimum of 3 qualified bids • In writing when the scope of work is equal to or exceeds $5,000

  8. or Phone Bids When a scope of work totals $4,999.99 or less

  9. The Bid Process cont. Change Orders Any change to an approved scope of work is a CHANGE ORDER • Requires Case Manager approval • RE-BIDDING REQUIRED when a unit price was not part of the original bid

  10. The Bid Process cont. • Eligible & Ineligible Items • Can be bid together PROVIDED that Separate Costs are obtained for the Fund Eligible Work

  11. Types of Bids • Lump Sum Bids • Unit Price Bids • Combination of the two

  12. Types of Bids • Lump Sum • Fixed total cost for providing materials or services

  13. Types of Bids continued • Unit Price • Cost by unit of measure • Number of units for each phase/sub-phase authorized on AAF

  14. Types of Bids continued • Lump Sum Bid with contingent Unit Rates • Additional units authorized using the Change Order Process

  15. Bid Form Changes • Changes have been made to the following: • Bid Summary Form • Bid Comparison Form – now 2 • Bid Work Progress Reporting • AAF Cost Worksheet

  16. Using an Existing Bid at Multiple Sites • The Existing Bid must be less than a year old • Copies of the original bid AND Bid Comparison form must be attached to a new Bid Comparison Form

  17. Using an Existing Bid at Multiple Sites • The new Bid Comparison Form is filled out with the new site information • List only the company that will perform the work or supply the item. • After use of the original bid is approved, work may proceed

  18. Using an Existing Bid at Multiple Sites • To transfer a bid from one site to another IT MUST BE THE ENTIRE BID

  19. Using an Existing Bid at Multiple Sites • Bids that contain eligible & ineligible items or activities CANNOT be used at another site

  20. $1,000 Limit • Certain cost for operation & maintenance exceed $1,000 over the duration of the CAP-IMP Phase

  21. $1,000 Limit For disposable items • unit pricing bids…

  22. $1,000 Limit Replacement parts or repairs outside the system’s warranty • 3 phone quotes or bids at the time the part is needed • justification of sole source purchase PRIOR to obtaining the part.

  23. Reimbursement of Bid Items • Shipping/Handling & Sales Tax are X-Coded on the AAF Cost Worksheet • 100% when item is shipped directly to the site • Allocated based on units used at site when item was shipped to your business location or warehouse.

  24. Reimbursement of Bid Items • Submit all subcontractor invoices for bid work. • Mark-up allowed only for costs billed to the RP through the Primary Consultant

  25. Reimbursement of Bid Items • Lump Sum Bids get claimed on Bid Cost Worksheet • Unit Price & Change Orders get claimed on AAF Cost Worksheet