1 / 31

Future Plans

Future Plans . Plan Of Way Forward. Currently No Concrete Plan Improvements To JTLS 4.0 Several Minor ECPs – Require No New Data Expected Around February or March JTLS 4.1 - ECPs - Require New Data Plan: Before Next User Conference JTLS 5.0 - Major Restructuring Discuss By JCW

tim
Download Presentation

Future Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Future Plans

  2. Plan Of Way Forward • Currently No Concrete Plan • Improvements To JTLS 4.0 • Several Minor ECPs – Require No New Data • Expected Around February or March • JTLS 4.1 - ECPs - Require New Data • Plan: Before Next User Conference • JTLS 5.0 - Major Restructuring Discuss By JCW • Work Starts Almost Immediately • Plan: Delivery In 2013 ROLANDS & ASSOCIATES Corporation

  3. Plan Of Way Forward • Implications • R&A Has • Two Separate Development Streams (JTLS 4.1, 5.0) • Two Maintenance Streams (JTLS 3.4, JTLS 4.0) • This Will Take A Month Just To Alter Procedures • When To Integrate Changes • Immediately – Interferes With Big Changes • Postpone – Will New Changes • Work With New Structure • Will We Remember What Needs To Be Integrated ROLANDS & ASSOCIATES Corporation

  4. Post JTLS 4.0 ROLANDS & ASSOCIATES Corporation

  5. DDS • Add Random Process Visualization Tool • Existed In Old DDS • Add GDP Capabilities To DDS • Map / Terrain Changes • Object Movement • Network Creation • Command Hierarchy • Logistics Hierarchy ROLANDS & ASSOCIATES Corporation

  6. Diesel Electric Submarines • Provide Remaining Battery Time On IMT • Currently Only Get Percentage Remaining • Address Assumptions • Speed Greater Submerged • Battery Not Used When Surfaced or Snorkel ROLANDS & ASSOCIATES Corporation

  7. Odds and Ends • Add OPM Time Unit Of Measure • BDA Summary Data In Air Mission Reports • Improve Intelligence Reports • JCW Provided Some New Requirements • Catapults Only Limit Takeoff • Limit Landing – Also Represent Arresting Gear • More Than One Glassfish Per Machine ROLANDS & ASSOCIATES Corporation

  8. AFAMS Test • Air Force Agency For Modeling and Simulation • Conducting Test – Can JTLS Be Used For • Tier 3 AOC Training • Prior To Test • Fix Some Known Tanker Reporting Issues • Expand TBMCS Reporting Details • Three Possible Outcomes • Yes, No • Maybe Due To Restrictions • Probably We Would Be Tasked To Correct Restrictions ROLANDS & ASSOCIATES Corporation

  9. Link To JCATS / VBS2 • Start Working Toward Link • 1516 Evolved ROLANDS & ASSOCIATES Corporation

  10. JTLS 4.1 ROLANDS & ASSOCIATES Corporation

  11. Naval Detections • Better Representation Of • Detection • No Change – Assign Un-Identified Number • Classification • Obtain Ship Basic Type (Symbol) • Recognition • Obtain Ship Class • Identification • Obtain Ship Name ROLANDS & ASSOCIATES Corporation

  12. Naval Detections • Existing • Sensor Detects Ship • Initial Report Time – Get Unidentified Ship Detection • Fusion Time – Get Identification • Basic New Concept • Not Every Sensor Can Accomplish Task • Requires Imagery Of Some Type • Not A Matter Of Time – Matter Of Distance • Fusion Time Only Used If Previously Detected ROLANDS & ASSOCIATES Corporation

  13. Re-Write Of HRU Code • Purpose • Make Orders More Consistent • More Flexibility In HRU Makeup • Entire HUP Capabilities Must Be Available • Need To Add Systems / Supplies To Meet Task • Multi-Simultaneous Tasks • Ability To Detect And Accomplish Other Tasks • Relook At Air Missions Rules At The Same Time ROLANDS & ASSOCIATES Corporation

  14. Representation Of TLAM-E • Also Known As Tomahawk® Block IV • Additional Capability Required • Reprogram the missile while in-flight • Required Two-way Satellite Communications • Can Only Strike15 Pre-Programmed Alternate Targets • May Not Implement This Restriction • Alternate Strike Any Target Coordinates • Using Global Positioning System (GPS) ROLANDS & ASSOCIATES Corporation

  15. Representation Of TLAM-E • Additional Capability Required (Con’t) • Can Loiter Over Target Area • Current Capability In JTLS • What Is Not Current Capability • Intel Collection While Doing So Using On Board Camera ROLANDS & ASSOCIATES Corporation

  16. Self Report Link-16 Ships • Current Capability • If Ship Has JU Source Number • Generates Message 2.3 – PPLI • We Do Not Support Link-16 Surface Tracks • Working With PACOM To Design Task • Consider How This Works With PIFF Codes • Passive Identification Friend or Foe ROLANDS & ASSOCIATES Corporation

  17. Combat Action Alert • Easy Way To Indicate When • Combat Action Starts • Combat Action Ends • What Is Happening In Combat ROLANDS & ASSOCIATES Corporation

  18. Unit / Target Hiding • More Explicit Representation Of • Hiding • In Bunkers • In Tunnels • Little Design Done So Far • Size Of Hiding Area • Where To Get In / Out • Possibility Of Being Trapped • JCATS Uses “Portals” ROLANDS & ASSOCIATES Corporation

  19. Link To Real World C4I • Continue Improvement To • ICC / TBMCS • New Links • PACOM - GDSS2 (Air Mobility) • JCW • HUMINT On-Line Tasking and Reporting • HOTR • Advanced Field Artillery Tactical Data Systems • AFATDS ROLANDS & ASSOCIATES Corporation

  20. Improve User Workload • Add Higher Level Planning Capability • New WHIP Tools • Air Tasking Order Generator • Ground Plan Development Tool • Contingency Development • Rule Based Execution Start • Spreadsheet Type Order Specification • Automated MSEL or MEL/MIL Order Entry ROLANDS & ASSOCIATES Corporation

  21. Investigate SOA • Service Oriented Architecture • Possible Models • Maintenance Model • Weather Model • Contamination Model • Line of Sight Model • Emitter Model ROLANDS & ASSOCIATES Corporation

  22. Investigate SOA • Service Oriented Architecture • Investigate • Method To Communicate (HLA / Other) • One Way Service • Request Service • Two Way Service • Speed Implications • Time Coordination Issues ROLANDS & ASSOCIATES Corporation

  23. Investigate SOA One Way Service - Example JTLS Emitter Turn On Turn Off ROLANDS & ASSOCIATES Corporation

  24. Investigate SOA Request Service - Example What Is The Weather At JTLS Weather The Weather Is Cloudy ROLANDS & ASSOCIATES Corporation

  25. Investigate SOA Two Way Service - Example Accept Damaged System Assets Such As Tow Truck JTLS Maintenance System Is Repaired ROLANDS & ASSOCIATES Corporation

  26. JTLS 5.0 ROLANDS & ASSOCIATES Corporation

  27. Remove Hex Terrain • Obviously Large Job • Terrain Service • How To Get The Data • No Problem For U. S. Government Users • Foreign Customers - Combatant Command Access • Time Consuming and Not Flexible • Limited To Military Customers • Civilian Customers Have No Choice • Allows Coordinate Terrain Data – JCATS / VBS2 ROLANDS & ASSOCIATES Corporation

  28. Remove Hex Terrain No Restrictions To Tiles

  29. Remove Hex Terrain Nested Tile Restriction

  30. Remove Hex Terrain • Committed To Network Overlay • Types Of Networks • Road • River – May Be Move To 4.1 • Rail • Air Corridor • Naval Lanes • Smooth Movement ROLANDS & ASSOCIATES Corporation

  31. Questions ROLANDS & ASSOCIATES Corporation

More Related