Second Visit - Huntsman Plant considerations Highlights

Second Visit - Huntsman Plant considerations Highlights. 13 September, 2004. Reasons of success. Normal, traditional manufacturing of pre-stressed concrete construction elements. This is important, since the production in former Soviet Union was not conforming to the simplest standards.

Download Presentation

Second Visit - Huntsman Plant considerations Highlights

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Second Visit - Huntsman Plant considerations Highlights 13 September, 2004

  2. Reasons of success • Normal, traditional manufacturing of pre-stressed concrete construction elements. • This is important, since the production in former Soviet Union was not conforming to the simplest standards. • Remember the Earthquake in Gumri and Spitak.

  3. Reasons of success • The technology of the pre-stressed concrete. • Introducing the roof tiles.

  4. Reasons of success • Correct management. • Correct salary policy. • This is very important since the production in former Soviet Union was not securing safety even in terms of construction.

  5. Plant Specifics • Huge capacity • Local resourses • Rather big inventory • One-month production cycle.

  6. Plant Specifics • Inventory. This gives opportunities for optimization of raw material order quantity.

  7. Economic Order Quantity - EOQ • Q – quantity to order • D – demand, or rate of use • P – period, P = Q/D, e.g. in days • h – holding cost per unit for the period P • H – total holding cost for P, H = h·(Q/2) ·P • C – ordering effort cost • I – inventory cost, I(Q) = H(Q) + C(Q) I(Q) = h·Q/2 ·P + C Iday = h·Q/2 + C/P Iday = h·Q/2 + C·D/Q

  8. EOQ, Iday(Q) = h·Q/2 + C·D/Q

  9. EOQ = 2CD/h

  10. Plant Specifics • Different aspects of transportation… • Cutting the slabs (panels).

  11. Plant Specifics – New productions • The idea of profitability of new productions is not certain, especially when there are no concrete suggestions. • As in the case of the bottle production in the YBC, need for more investigation in this issue.

  12. Research • Plant has a laboratory, where the new types of concrete are developed. • However, there is a need for: • More technological research to use typical Armenian raw materials e.g. perlytes for lighter better production that will have e.g. better heat insulating characteristics; • Marketing! The bottleneck is in the market!

  13. Infrastructure • What does this plant add to Armenian infrastructure? • Positive example of success in general and particularly in the area of production of construction materials. • Experience of specialists, knowledge. • Strict quality issues, as peoples’ lives depend on the quality of construction materials.

  14. You have to pay attention to: • %-age of the used capacities; • Times, • Yields, also: • PLEASE LOOK AT POTENTIAL IE PROBLEMS. E.G.: • EOQ; • TRANSPORTATION; • SCHEDULING.