GBRIA/ABC Craft Training Center Quick Overview

GBRIA/ABC Craft Training Center Quick Overview. ABC Craft Training Center Overview. Craft Training Center was built in mid 1980 ’ s in response to a lack of trained craft workers

tino
Download Presentation

GBRIA/ABC Craft Training Center Quick Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GBRIA/ABC Craft Training Center Quick Overview

  2. ABC Craft Training Center Overview • Craft Training Center was built in mid 1980’s in response to a lack of trained craft workers • Industry leaders and contractors developed an informal agreement to pay for the school and ongoing expenses, which has lasted until today

  3. ABC Training Center Overview • Annual Budget $1.2 - $1.5 million • Number of Students Graduating 1100 – 1800/year • Avg. Cost per Student Course $833 - $1090 • Student Fees $40/course/semester • Offering = Skills Assessments, Training and Certification Exams using the • NCCER standard (National Center for Construction Education and Research, www.nccer.org)

  4. Original and Current ABC Funding Methods • Original Method 1985 - 1988 • 1/2 of 1% of straight time wages for all hours worked by appropriate merit shop contractors on plant site $25,000 cap on each plant • Example: Sample Chemical Co. • Boilermakers – 2000 hours * $12.5/hr*0.005=$125 • Scaffoldbuilders – 1000 hours*10.25/hr*0.005=$51.25 • Welders – 5000 hours * $18/hr*0.005=450 • Grass cutters – not applicable • Total Fee to Sample Chemical = $626.25

  5. Original and Current ABC Funding Methods • 1989 - 1993 •  3/4 of 1% of straight time wages for all hours worked by appropriate merit shop contractors on plant site. •  No cap

  6. Original and Current ABC Funding Methods • 1994 to present • 7 cents per hour for all hours worked by appropriate merit shop contractors on plant site • Billing/Collection • Contractors include 7 cents on invoices to plants • ABC Bills Contractors monthly • Some plants pay directly to ABC instead of including in payment to contractors • Either method is acceptable

  7. The GBRIA/ABC Agreement • GBRIA and ABC developed the following agreement in 1994 which we encourage to be included in Contract Language • ABC Training Center funding will be paid for all merit shop contractors performing maintenance and capital projects in member facilities of the Greater Baton Rouge Industry Alliance, Inc. (GBRIA) and whose skilled work force will be primarily comprised of local labor working in the Greater Baton Rouge area. • Members of GBRIA agree to reimburse contractors for all on-site labor at the rate of seven (7) cents per craft hour or pay directly to the ABC Training Center this amount on a monthly basis. This includes all craft hours worked for maintenance, cost plus, unit price, and lump sum construction for craft skills listed in Attachment A. This fee will be paid on worked craft hours (straight and overtime) on all construction, shop fabrication and maintenance work.

  8. Skills Payable Welders Pipefitters Boilermakers Machinists Riggers Millwrights Ironworkers Painters Insulators Carpenters Craft Helpers Tank maintenance (boilermakers/welders) Equipment operators Instrument fitters/techs HVAC Brick masons Electricians Tower Contractors (boilermakers/welders) Concrete finishing (e.g. rebar, finishing & forming) Plumbing Scaffold Sprinkler Fitting Sheet metal Cooling Tower (millwright, electrical, pipefitter & carpenter) Electrical testing Working foremen Attachment A

  9. Skills Not Payable Union Professional Janitorial Security X-ray/inspection Scale maintenance Electronics Auto repair Supervisors, clerks & timekeepers Service/specialty Railroad repair/switching Refractory Attachment A (Continued)

  10. Tracking the Funding • ABC implemented an online accounting system at year end 2003 • Plants enter their hours monthly • Contractors enter their hours monthly • Differences are reconciled between GBRIA and ABC to assure accountability

  11. Enter monthly hours from ABC’s website

  12. Or from the GBRIA website

  13. GBRIA

  14. GBRIA

  15. GBRIA/ABC Joint Taskforce • Mission Ensure that the ABC Craft Training Center meets craft training excellence expected by the greater Baton Rouge industrial community while providing a cost competitive educational opportunity now and into the future • Members • GBRIA – 4 plant representatives and staff • ABC – Chair & Vice Chair of ICC • Vice Chair of Education & Manpower from ABC Executive Committee • Chair & Vice Chair of Education & Manpower Committee • ABC staff • Meets quarterly

  16. GBRIA/ABC Joint Taskforce • Key Objectives • Meet budgetary requirements • Maintain NCCER accreditation • Provide curriculum that meets the industry needs • Ensure that alternate funding ideas/issues are transferred to appropriate committee(s) within ABC and GBRIA. • Oversee and improve current funding mechanism. • Resource management. • Key Measures of Success • 80% retention of craft training students • 90% of graduates achieving cut score on written assessment • 100% collection of contractor work hours reported.

  17. GBRIA/ABC Taskforce • 2006 Goals • Increase enrollment • Change model from night school for industrial contractors to also include a day school open to public