Long Guiding Tube

Long Guiding Tube. R. Vuillermet 17/03/2011. Status at CERN. Status Some connection prototypes are under fabrication (4 in totals). Louis Rose-Dulcina is in charge of this task 3M DP460 scotch-Weld was ordered (shall be delivered next week)

tino
Download Presentation

Long Guiding Tube

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Long Guiding Tube R. Vuillermet 17/03/2011

  2. Status at CERN • Status • Some connection prototypes are under fabrication (4 in totals). Louis Rose-Dulcina is in charge of this task • 3M DP460 scotch-Weld was ordered (shall be delivered next week) • Week 13, special cleaning and surface preparation will be done in the polymer lab at CERN for gluing test . • Once glued, some section cutting will be done to check the glue coverage to validate the joint geometry • Once validated, the machining of 3735 mm pipe will be done and prepare for the gluing (we are waiting Andrei for this final operation)

  3. Joint Geometry

  4. Section prototypes