1 / 2

SPS – CSAP report

SPS – CSAP report. CSAP planned on 20/12/2012 cancelled, only 2 meetings since last IEFC report. However, several issues came to a conclusion and were realised or resulted in engineering requests for LS1: Beam immanent warning in EHN1 and EHN2 finished and functioning.

tirza
Download Presentation

SPS – CSAP report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SPS – CSAP report • CSAP planned on 20/12/2012 cancelled, only 2 meetings since last IEFC report. • However, several issues came to a conclusion and were realised or resulted in engineering requests for LS1: • Beam immanent warning in EHN1 and EHN2 finished and functioning. • Interlocking of TI2 and TI8 Upstream Areas with LHC Powering (ECR 1257949). • Moving the LHC-SPS sector door in TI2 further downstream (ECR 1253832). • Access in SMI2 will be controlled by a key in the CCC interlocking chain 5.

  2. Others • Presentation from TCC2-TDC2 working group • Being worked on • Level 4 training for SPS access. • Preparation for fire brigade exercise : evacuation of injured person from an SPS underground area.(during magnet patrol period)

More Related