60 likes | 203 Views
Construction Site – current Google Maps View. Construction Site today. 4. FAIR @ Darmstadt. Construction in Modules. Nuclear Structure & Astrophysics (Rare-isotope beams). Hadron Physics (Stored and cooled 14 GeV/c anti-protons). SIS18. p-Linac. SIS100 /300. UNILAC.
E N D
ConstructionSite – current Google Maps View Construction Site today Short Status of FAIR for NuPECC /KP 4
FAIR @ Darmstadt Construction in Modules Nuclear Structure & Astrophysics (Rare-isotope beams) Hadron Physics (Stored andcooled 14 GeV/c anti-protons) SIS18 p-Linac SIS100/300 UNILAC QCD-Phase Diagram (HI beams 2 to 45 GeV/u) HESR Rare-Isotope Production Target Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Module 0: SIS100 andconnection toexistingaccelerators Anti-Proton Production Target Module 1: Experimental areas Dense Bulk Plasmas (Ion-beam bunchcompression & petawatt-laser) CR &RESR Cryring Module 2: Super-FRS NESR Materials Science & Radiation Biology (Ion & antiproton beams) 100 m Accelerator Physics Module 3: High-energyp(p-linac, p, CR,HESR) Short Status of FAIR for NuPECC /KP
FAIR Experiments in all 4 scientificcoreactivities CBM APPA Super-FRS PANDA NuSTAR Short Status of FAIR for NuPECC /KP
Planning Activities Short Status of FAIR for NuPECC /KP
Civil Engineering New Beamline: ∑ 3.2 km thereof Syncrotron: 1.1 km Existing:SIS 18 600.000 cbm > 1 Miotonsofconcrete 35.000 tonsofsteel Short Status of FAIR for NuPECC /KP
status of piling works • piling todate: • wellaheadofschedule • goal: finishedbeforeQ III/2014 Klaus Peters - Exotics at PANDA Short Status of FAIR for NuPECC /KP