1 / 4

2006 year. Shipping (#3) of the rest of equipment + materials for 40’s BLM production in April.

2006 year. Shipping (#3) of the rest of equipment + materials for 40’s BLM production in April. 22.02 – EDH Shipping Request created. 23.02 – The documents registered in qualiac. 25.02 - Attachment #3 signed by L.Evans and transferred to IHEP Director N.Tyurin for signature.

tobias
Download Presentation

2006 year. Shipping (#3) of the rest of equipment + materials for 40’s BLM production in April.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2006 year. • Shipping (#3) of the rest of equipment + materials for 40’s BLM production in April. • 22.02 – EDH Shipping Request created. • 23.02 – The documents registered in qualiac. • 25.02 - Attachment #3 signed by L.Evans and transferred to IHEP Director N.Tyurin for signature. • 01.03 – 23 packages/10335 kg and CERN documents was ready to go. • 17.03 – Transport by Direct Truck from CERN. • 29.03 – Packages was unloaded at IHEP. • Shipping (#4) of the components for 100’s Head welding. • 1.02.03 – EDH Shipping Request created. • 03.03 – The documents registered in qualiac. • 04.03 - Attachment #4 signed by L.Evans and transferred to IHEP Director N.Tyurin for signature. • 03.03 – 1 case/50 kg and CERN documents was ready to go. • 17.03 - Transport by Direct Truck from CERN. • 29.03 – Packages was unloaded at IHEP. • Shipping (#5) of the components for 360’s BLM production in May, including the components for 400’s Head welding. • 1. 14.03 – EDH Shipping Request created. • 2. 15.03 – The documents registered in qualiac. • 3. 16.03 - Attachment #5 was signed by P.Bryant and IHEP Director N.Tyurin. • 4. 15.03 – 3 packages/701 kg was collected by Internal Transport and CERN documents was ready to go. • 23.03 – Transport by Groupage Truck from CERN. • 13.04 – Packages was unload at IHEP

  2. Shipping (#6) of the components for 360’s BLM production in June, including the components for 300’s Head welding. • 1. 4.04 – EDH Shipping Request created. • 5.04. - Attachment #6 signed by L.Evans and transfered to IHEP Director N.Tyurin for signature. • 7.04 - 2 packages/875 kg andCERN documents was ready to go. • 12.04 - Transport by Groupage Truck from CERN. • 06.05 – Packages was unload at IHEP • Shipping (#7) of the components for 360’s BLM production in July, including the components for 1200 Heads welding (July, August, September) and 250 UK Heads. • 18.05 – EDH Shipping Request created. • 18.05. - Attachment #7 signed by P.Bryant and transfered to IHEP Director N.Tyurin for signature. • 23.05 – The documents registered in qualiac. • 24.05 - 6 packages/2305 kg was collected by Internal Transport . • 29.05 - CERN documents was ready • 31.05 Transport by Groupage Truck from CERN. • 27.06 – Packages was unload at IHEP • Shipping (#8) of the components, Detergent and vacuum equipments, including the 50 UK Heads. • 8.06 – EDH Shipping Request created. • 9.06. - Attachment #8 signed by P.Bryant and transfered to IHEP Director N.Tyurin for signature. • 12.06 - 6 packages/965 kg was collected by Internal Transport • 13.06 - CERN documents was ready to go. • 22.06 - Transport by Groupage Truck from CERN • 6. 17.07 – Packages was unload at IHEP

  3. Shipping (#9) of the components for BLM production, including the components for Heads welding. • 1. 18.07 – Shipping was ready. • 2. 18.07 – Shipping Request created in EDH • 3. 19.07. - Attachment #9 signed by P.Bryant and transfered to IHEP Director N.Tyurin for signature. • 4. 25.07 - 9 packages/ 2104.5 kg and CERN documents are ready to go. • 5. 10.08 - Transport by Groupage Truck from CERN • 6. 29.08 – Packages was unloaded at IHEP • Shipping (#10) of the components for BLM production, including the spare vacuum equipment and the components for Heads welding. • 20.09 – Shipping was ready. • 2. 20.09 - Shipping Request created in EDH • 3. 21.09 - Attachment #10 signed by P.Bryant and transfered to IHEP Director N.Tyurin for signature. • 4. 25.09 - 2 packages/ 506 kg and CERN documents are ready to go. • 29.09 - Transport by Groupage Truck from CERN • 6. 27.10 – Packages was unloaded at IHEP • Shipping (#11) of the components for BLM production, including the spare vacuum equipment and the components for Heads welding. • 1. 27.11 – Shipping was ready. • 2. 27.11 - Shipping Request created in EDH • 3. 27.11 - Attachment #11 signed by P.Bryant and transfered to IHEP Director N.Tyurin for signature. • 4. 28.11 - 6 packages/ 1600 kg and CERN documents are ready to go. • 5. ~1.12 - Transport by Groupage Truck from CERN • 6. Eve NY– Packages will be unloaded at IHEP

  4. Shipping #1 of the 40 BLM_IC production (June) • 1. 16.06 – 40 departed from IHEP • 22.06 – 40 arrived at CERN • Shipping #2 of the 360 BLM_IC production (July) • 1. 7.07 – 360 IC are ready to ship. • 2. 25.07 – it departed from IHEP. • 3. 3.08 – it arrived at CERN. • Shipping #3 of the 360 BLM_IC production (August). Transport ordered by CERN. • 1. 10.08 360 IC are ready to ship. • 2. 15.08 – The Lorry departed from IHEP. • 3. 24.08 – The Lorry arrived and unload at CERN. • Shipping #4 of the 360 BLM_IC production (September). Transport ordered by CERN. • 1. 15.09 360 IC are ready to ship. • 2. 19.09 – The Lorry departed from IHEP. • 26.09 – The Lorry expect to arrive at CERN. • Shipping #5 of the 360 BLM_IC production (October). Transport ordered by CERN. • 1. 27.11 360 IC are ready to ship. • 2. 29.11 – The Lorry will depart from IHEP. • 3. ~7.12 – The Lorry will arrive at CERN.