Initial Capacity Modeling. Collection System Monitoring. Flow Within System Capacity. Surcharge or SSO Condition. Re-evaluation Modeling. Flow Reduction. Surcharge Condition OK. Capacity Increase Required. I & I Study and Evaluation. Project Design & Implementation. Removal of I & I.
E N D
Initial Capacity Modeling Collection System Monitoring Flow Within System Capacity Surcharge or SSO Condition Re-evaluation Modeling Flow Reduction Surcharge Condition OK Capacity Increase Required I & I Study and Evaluation Project Design & Implementation Removal of I & I I & I Reduction not Feasible