490 likes | 504 Views
Tipp City Schools Community Meeting. Purpose: To solicit input for the development of a 5-year plan. Five-Year Plan. Facilities plus Programming determine Financial Needs. History of Facilities. 1916 – Tipp Central 1953 – Broadway Elementary 1959 – Nevin Coppock Elementary
E N D
Tipp City Schools Community Meeting Purpose: To solicit input for the development of a 5-year plan
Five-Year Plan • Facilities plus • Programming determine • Financial Needs
History of Facilities • 1916 – Tipp Central • 1953 – Broadway Elementary • 1959 – Nevin Coppock Elementary • 1964 – Tippecanoe High School (now TMS) • 1966 – Broadway addition • 1972 – High School addition • 1974 – LT Ball Intermediate • 2004 – New Tipp High School
Facility Limitations - Academics • Technology • Wireless connectivity • Electricity • Heating, ventilation, air conditioning • Additional classrooms • Storage
Broadway/Tipp Central • Controls for Heating System
Broadway/Tipp Central • Heating system pipes rusting out
Broadway/Tipp Central • Tunnel that houses heating system
Broadway/Tipp Central • Ceiling Damage
Broadway/Tipp Central • Moisture damage to ceiling tiles
Broadway/Tipp Central • Moisture Damage
Broadway Gym • Worn poured-rubber gym floor
Broadway Gym • Seats in gym “auditorium”
Broadway Elementary • Old lighting, small windows
Broadway Elementary • Old asbestos flooring
Broadway Elementary • Add-on structural support
Nevin Coppock Elementary • Need classroom space – 1 room partitioned into 3
Nevin Coppock Elementary • Outdated restrooms – flushing issues
Nevin Coppock Elementary • Storage shortage – Only storage is in restrooms
LT Ball Intermediate • Cooling tower needs to be replaced
LT Ball Intermediate • Old chiller – oil leaks
LT Ball Intermediate • Heating, Ventilation, AC controls need to be replaced
LT Ball Intermediate • 4 classrooms can only be accessed through other rooms
Tipp Middle School • Old asbestos floor tiles
Tipp Middle School • Electrical: Shortage of outlets
Tipp Middle School • Electrical issues
Tipp Middle Schools • Electrical issues
Tipp Middle School • Electrical Issues
Tipp Middle School • Electrical: Many walls without outlets
Tipp Middle School • New wiring/lighting needed in upstairs rooms
Tipp Middle School • Only access from one classroom is through another classroom
Tipp Middle School • 9 TMS teachers “on carts” – have no room of their own
Tipp Middle School • “Standing room only” in lunchroom
Tipp Middle School • …And the lunch line continues in the hall
Facility Limitations - Athletics • Tennis Courts • Baseball/Softball Fields • Football/Soccer Stadium (city-owned) built 1947
Athletic Facilities • Tennis courts in disrepair
Athletic Facilities • Tennis Courts
Athletic Facilities • Baseball bleachers
Athletic Facilities • Baseball dugout
Athletic Facilities • Structures at football/soccer field in City Park are in disrepair
Athletic Facilities • Bleachers at football/soccer field inadequate and rusting out.
Athletic Facilities • Bleachers at football/soccer field
Athletic Facilities • Bleachers at football/soccer field
Athletic Facilities • Football/soccer field – drainage from park carries gravel onto the field
Athletic Facilities • Press box at football/soccer field
Athletic Facilities • Portable toilets at football/soccer field
Athletic Facilities • Trailer for visiting teams at football/soccer field
Athletic Facilities • Small, inadequate concession stand at football/soccer field
Athletic Facilities • Roundhouse “dressing room” – we will lose access in 2012
Community Input – Your Ideas • Questions? • Please help us plan • This Power Point available online at: www.tippcityschools.com • Community survey coming soon.