PWL/Local Acceptance

PWL/Local Acceptance. 2013 demonstration Projects Three Possibilities - DOT does all testing - DOT does verification testing of 20% of samples & uses contractor QC results - DOT witnesses contractor testing (100% state funded projects).

Download Presentation

PWL/Local Acceptance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PWL/Local Acceptance 2013 demonstration Projects Three Possibilities - DOT does all testing - DOT does verification testing of 20% of samples & uses contractor QC results - DOT witnesses contractor testing (100% state funded projects)

  2. PWL/Local Acceptance(continued) 100% pay at 90 PWL Up to 4% bonus at 100PWL R & R at less than 50 PWL 70% pay if left in place Change %200 tolerance to +/- 1.5% %200 can not trigger R & R until >2.0% OLPF=0.5D+0.3AC+0.1(200)+0.1 PCS

  3. PWL/Local Acceptance(continued) Contractor plant Proficiency Assessment QC & Verification testing done at plant IA testing done at LTS All testers NECEPT Certified Local Acceptance testing top priority

  4. PWL/Local Acceptance(continued) Individual, specific oven correction factors QC done within 36 hours of sampling Verification done within 2 work days of QC Compare QC and Verification with “F&t” testing (need 7500 tons to do this)