PWL/Local Acceptance. 2013 demonstration Projects Three Possibilities - DOT does all testing - DOT does verification testing of 20% of samples & uses contractor QC results - DOT witnesses contractor testing (100% state funded projects).
E N D
PWL/Local Acceptance 2013 demonstration Projects Three Possibilities - DOT does all testing - DOT does verification testing of 20% of samples & uses contractor QC results - DOT witnesses contractor testing (100% state funded projects)
PWL/Local Acceptance(continued) 100% pay at 90 PWL Up to 4% bonus at 100PWL R & R at less than 50 PWL 70% pay if left in place Change %200 tolerance to +/- 1.5% %200 can not trigger R & R until >2.0% OLPF=0.5D+0.3AC+0.1(200)+0.1 PCS
PWL/Local Acceptance(continued) Contractor plant Proficiency Assessment QC & Verification testing done at plant IA testing done at LTS All testers NECEPT Certified Local Acceptance testing top priority
PWL/Local Acceptance(continued) Individual, specific oven correction factors QC done within 36 hours of sampling Verification done within 2 work days of QC Compare QC and Verification with “F&t” testing (need 7500 tons to do this)