1 / 9

User Case Study – CEP in Dynamic Resource Management

Explore a case study on implementing dynamic resource management for efficient train operations, addressing challenges like crew assignment, terminal congestion, and track velocity. Learn how concept modeling and optimization can enhance resource allocation and increase operational efficiency.

tomasc
Download Presentation

User Case Study – CEP in Dynamic Resource Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. User Case Study – CEP inDynamic Resource Management Alan Lundberg TIBCO Software Inc.

  2. Key Constraints • Yards & Ramps Trains (over 3,000 active per day) Crews (6,000 to 8,000 per day on trains) Cars (over 107,000) Tracks (32,000 miles)

  3. Dynamic Resource Management Concept • Each train demands the 5 critical resources over time • For a train plan to be effective, all trains must have all resources allocated • As the train schedule moves, the resource demand moves Resource Supply Dimension  Train Demand Dimension  Time  Train Schedule Crew Assignment Locomotive Assignment Terminal Resource Allocation Network Capacity Allocation Car Assignment

  4. Sample Train Resource Allocation

  5. Network OperationsVelocity - MPH Good Hurricanes Bridge Fire Storm Damage PRB Issues Floods Blizzards 2005 2006

  6. Business Pain • Less than half of all network schedules achieved • Track velocity = 17 mph. Every increase in 1 mph = • Hired many crew members last year to improve schedules – huge cost (fixed) and now customers over-schedule and use crews unwisely • Workforce issues and logistics • Appear at capacity but a system of over-schedule • Backup ramification to car management – terminal congestion – fuel consumption – dwell location – intermodal SLAs etc.

  7. Concept Modeling for Dynamic Resource Management

  8. Case Study Monitoring and Optimizing: Trains, Track Segments, Crews, Terminal Locations, etc

  9. Dynamic Resource Management Case Study • All parts of a complicated process are monitored from end-to-end • There is a lack of : • Visibility into the overall process • Notification if something is down • Correlating activities from various unrelated applications • Increased need for: • Tracking history • Compliance and governance • Correlation of unrelated events • Root cause analysis • There’s always a plan…. but things never go according to plan

More Related