CCSDS Security Working Group Spring 2009 Meeting 21-23 April 2009 Colorado Springs, Colorado USA. Howard Weiss SPARTA, Inc. AGENDA. 20 April 2009 08:00 – 09:00 : CCSDS Plenary 09:00 – 10:00 : Systems Engineering Area (SEA) Plenary 10:00 – 17:00 : Space Data Link Layer Security BOF
E N D
CCSDS Security Working GroupSpring 2009 Meeting21-23 April 2009Colorado Springs, Colorado USA Howard WeissSPARTA, Inc
AGENDA • 20 April 2009 • 08:00 – 09:00: CCSDS Plenary • 09:00 – 10:00: Systems Engineering Area (SEA) Plenary • 10:00 – 17:00: Space Data Link Layer Security BOF • 21 April 2009 (13:00 – 17:00) • Welcome, opening remarks, logistics, agenda bashing, introduction for new attendees • Review of document progress and results of Fall 2009 meeting • Document Status (security architecture, encryption, authentication, key management, mission planners) • Review CWE WG entries: charter, programs, schedules • “Big Picture” discussions (Black) (cont from Berlin) • Encryption Document RID review and disposition • 22 April 2009 (09:00 – 17:00) • Security Architecture Document Discussions (Black) • Mission Planner’s Guide (Biggerstaff) • Key Management (Fischer) • Application Layer Security (Pajevski) • Network Layer Security (Pajevski/Weiss) • Agency specific security practices (approach, requirements, security services) (template previously circulated) • 23 April 2009 • 09:00-12:00: Overflow • 13:00-17:00: SEA Wrap-up Plenary
Status • Berlin (October 2008) Progress: • Discussed “Big Picture” – where are we and where are we going in the Security WG • Discussed SecWG Security Architecture – to be completed by March 2009 meeting • Reviewed Key Management Green and Magenta docs – again reviewed in January telecon. • Discussed application layer security in general. Many action items with additional discussions this meeting. • Reviewed Mission Planners Security Guide draft. Will be aligned with Arinc 811. • Held mtg w/Space Link Layer Security BOF • Current Progress: • Held interim telecon January 7, 2009 to discuss KM • RIDs received from INPE, CNES, and ESA on encryption doc to be dispositioned at this meeting
Document Status • Encryption • Agency review yielded RIDs from INPE, CNES, and ESA • Plan: disposition the RIDs today and move on with the document • Authentication • Last check, still in Secretariat editing stack • Security Architecture • Gordon • Mission Planner’s Guide • Craig • Key Management • Green Book draft distributed to mail list and posted to CWE • Magenta Book - ?