1 / 17

Construction Services Kent & Commercial Construction Company Tukwila

Top Rung LLC is the largest construction building repair and maintenance service company in Tacoma. We provide a very excellent commercial construction building service whole area of Washington.

toprungllc
Download Presentation

Construction Services Kent & Commercial Construction Company Tukwila

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. http://www.toprungllc.com

  2. Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle WA USA. We offer customer satisfaction commercial building service, residential construction building service, industrial construction building service, remodels, repair and maintenance service, general contractor service several areas of Washington.

  3. Construction Phase Include 1) Site Preparation, 2) Slap 3) Frames and Roof Trusses 4) Roof Tiling of Metal Roofing 5) Brick Work 6) Rough Linings 7) Internal Linings 8) Waterproofing and Tiling 9) Timber Mould Out 10) Lock Up 11) P.C Fit Out 12) Practical Completion 13) Handover 14) Thanks

  4. Site Preparation This involves clearing of the site and pegging out of the site by the surveyor. Sometimes retaining walls will also be built at this stage if required.

  5. Slab • The plumber will need to lay plumbing that will be located beneath the slab of the development. This needs to be done before the slab can be formed up. The slab pairing is then completed as per the engineer’s specifications and plans and then the slab can be poured. It’s very exciting to see the slabs go down.

  6. Frames and Roof Trusses The frames are generally prepared before being delivered to site and can be erected very quickly with a day or so. It’s great to walk around the site once the frames are up and get a feel for each room.

  7. Roof Tiling of Metal Roofing Some builders prefer to complete the roof before starting the brickwork and other builders work the other way around. I’ve found predominately builders want to get the roof on as quickly as possible to protect the frames.

  8. Brick Work This stage really gives the development true structure, and you can feel the development making good progress when you see the brickwork completed.

  9. Rough Ins This involves the electrical and plumbing wiring and pipes to be installed before the internal linings to the frames.

  10. Internal Linings After the rough in is complete, the insulation will be installed into the wall and ceilings and then the plaster will start on lining the walls and ceilings. You really get a good sense of space within the dwellings at this stage.

  11. Waterproofing and Tiling The wet areas will be water-proofed in preparation for the tilers to start work, generally after or even during the timber mould out.

  12. Timber Mould Out This stage involves the carpenters installing the skirting boards, architraves, door jams and doors and kitchens.

  13. Lock up Is when all external doors including garage doors are on.

  14. P.C. Fit Out P.C. is a term for a prime cost item and includes tap ware, bath, mirror, vanities and other accessories, which are installed at this stage.

  15. Practical completion This is the point in time when an inspection is conducted when builder is almost finished. You will walk through the development with the site manager and point out any items that still need attention. By this time it should only be touch ups and minor items requiring installation.

  16. Handover This is when you are happy the construction has been completed to your satisfaction and to the plans and after paying the builder’s final invoice, keys will be handed over to you.

  17. THANKS FOR WATCHING CONSTRUCTION BUILDING AND BUILDINGCONTRACTORS SERVICE FOR TOPRUN LLC.

More Related