1 / 16

Cleaner Air For All of Us An Industry Commitment

torgny
Download Presentation

Cleaner Air For All of Us An Industry Commitment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Cleaner Air For All of Us An Industry Commitment

    11. Process gas compressor upgrades. FCCU CO boilers reliability. Flare gas recovery systems. Flare system modifications. Advanced process controls. Electrical power supply reliabilityProcess gas compressor upgrades. FCCU CO boilers reliability. Flare gas recovery systems. Flare system modifications. Advanced process controls. Electrical power supply reliability

    12. How was this achieved? Air Emission Reduction Projects Industry Spent over $1.1Billion since 1998 Spending another $1.4 Billion in next 5 years Plant Reliability Emissions from plant equipment malfunctions decreased 64% over the last five years alone and have dropped 96 %since 1998 Process gas compressor upgrades. FCCU CO boilers reliability. Flare gas recovery systems. Flare system modifications. Advanced process controls. Electrical power supply reliabilityProcess gas compressor upgrades. FCCU CO boilers reliability. Flare gas recovery systems. Flare system modifications. Advanced process controls. Electrical power supply reliability

    13. Ambient air monitoring shows Continuous improvement Ozone levels show area in attainment of current standard Air toxic levels are consistently below the TCEQ Health Effects Screening Levels Process gas compressor upgrades. FCCU CO boilers reliability. Flare gas recovery systems. Flare system modifications. Advanced process controls. Electrical power supply reliabilityProcess gas compressor upgrades. FCCU CO boilers reliability. Flare gas recovery systems. Flare system modifications. Advanced process controls. Electrical power supply reliability

    14. For Further Progress ISET Supports Timely NSR permitting programs to support expansion timetables  EPA approval of TCEQ petition for re-designation of the Golden Triangle as attainment of the 1997 ozone standard. Removing Golden Triangle cities to from TCEQ “Air Pollutant Watch Lists”. Recognition that 50% overall emissions reduction and 96% reduction of emissions from plant upsets demonstrates that environmental improvement is achievable through stakeholder cooperation as well as regulation. Process gas compressor upgrades. FCCU CO boilers reliability. Flare gas recovery systems. Flare system modifications. Advanced process controls. Electrical power supply reliabilityProcess gas compressor upgrades. FCCU CO boilers reliability. Flare gas recovery systems. Flare system modifications. Advanced process controls. Electrical power supply reliability

    15. Survey Data Sources Industry of Southeast Texas (ISET) is a dba of the Southeast Texas Plant Manager’s Forum, a non-profit Corporation ISET represents companies operating in Orange, Hardin and Jefferson counties All emissions data is provided by 32 member companies Data Presented is aggregate of all reporting companies Process gas compressor upgrades. FCCU CO boilers reliability. Flare gas recovery systems. Flare system modifications. Advanced process controls. Electrical power supply reliabilityProcess gas compressor upgrades. FCCU CO boilers reliability. Flare gas recovery systems. Flare system modifications. Advanced process controls. Electrical power supply reliability

    16. Participating Companies Process gas compressor upgrades. FCCU CO boilers reliability. Flare gas recovery systems. Flare system modifications. Advanced process controls. Electrical power supply reliabilityProcess gas compressor upgrades. FCCU CO boilers reliability. Flare gas recovery systems. Flare system modifications. Advanced process controls. Electrical power supply reliability

More Related