20 likes | 107 Views
SP-B1 “Gas storage for CNG engines”. WP2 - Main Results: Safety Validation of Advanced Type IV CNG Vessels. WRUT : Please insert the most significant results of your activities on this slide. SP-B1 “Gas storage for CNG engines”. WP2 - Main Results:
E N D
SP-B1 “Gas storage for CNG engines” WP2 - Main Results: Safety Validation of Advanced Type IV CNG Vessels WRUT : Pleaseinsert the mostsignificantresults of youractivities on this slide
SP-B1 “Gas storage for CNG engines” WP2 - Main Results: • Safety validation of advanced CNG pressure vesselsin accordancewithECE R110regulation: • Cyclic test at ambient temperature • Cyclic test at extreme temperatures • Hydrostatic pressure burst test • Accelerated stress rupture test • Impact damage test • High temperature creep test Morethan 40 vesselsweretestedat WRUT laboratory. • Pre-regulatory research with NOL ringson improved test procedures: • Ultimate strengthtest (tensileslow) • Creeptest (staticfatigue)