An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COMELEC SESSION 3:OVERVIEW

  2. COMELEC Members • ALGERIA • LIBYA • MOROCCO • MAURITANIA • TUNISIA

  3. Power Pool Overview • Pool set up in 1989, under the auspices of UMA (Union du Maghreb Arabe – Arab Maghreb Union) • Main objective: to study and propose solutions to power utilities companies that are members, share best practises • Key activities undertaken so far: • Participation into ELTAM study (interconnection Egypt-Lybia-Tunisia-Algeria-Morocco) and signing of project implementation convention between the 5 countries • Creation of the Maghreb Interconnection Commission, which studies, defines management conditions and coordinates cross-border power exchanges between Tunisia, Algeria and Morocco, taking into account the Maghreb-Europe interconnection via Spain • Participation, in year 2000, into the MEDRING study: joint management of the interconnected power loop amongst Mediterranean countries • Participation in, and distribution of, annual statistics on power activity in Maghreb • Next key activities planned: • Implementation of ELTAM interconnection project • Development of a Maghreb Power Market • Preparation for reliable synchronous management of interconnected power systems of ELTAM countries

  4. Upcoming Key Projects in Pool Area (I) Nr. Project name Country (ies) Type(1) Est. cost ($M) Est. Readiness 1 ELTAM interconnections Morocco, Algeria, Tunisia, Libya, Egypt REHAB] 250 (excluding Morocco-Algeria interconnection) Project started. Expected completion between 2010 and 2015 2 Sub-marine cable interconnection Algeria, with Spain REHAB] N/A Pre-feasibility Study 3 HVDC Sub-marine cable interconnection Libya, Tunisia and / or Morocco with Italy REHAB N/A Pre-feasibility Study 4 Power Generation Plants Libya GAS GEN DIV GEN N/A Various, depends on power plant (1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type

  5. Upcoming Key Projects in Pool Area (II) Nr. Project name Country (ies) Type(1) Est. cost ($M) Est. Readiness 5 CC Power plant of Ghannouch, 2009 Tunisia GAS GEN 230 Tender evaluation 6 Wind power plants 2008-2009 Tunisia DIV GEN 150 Request for tenders 7 Development of the transmission network 2007-2011 Tunisia REHAB 250 Launching of requests for tenders by lots, on an ongoing basis 8 7 CC and TG power plants Tunisia REHAB N/A 2008-2010 (1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type