1 / 5

PS BOOSTER M. Chanel

PPC : 15 octobre 1999. PS BOOSTER M. Chanel. OPERATION. Irradiation:mesure après 32h bonnes<total 12/99 Déplacement pertes de 14B2 en 11B1. Faisceaux corrects mais pas top perf. 3200 to Isolde couramment avec 11 tours. LHC tests beam avec diverses intensités Amélioration synchro PS:

toshi
Download Presentation

PS BOOSTER M. Chanel

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PPC : 15 octobre 1999 PS BOOSTERM. Chanel

  2. OPERATION • Irradiation:mesure après 32h bonnes<total 12/99 • Déplacement pertes de 14B2 en 11B1. • Faisceaux corrects mais pas top perf. • 3200 to Isolde couramment avec 11 tours. • LHC tests beam avec diverses intensités • Amélioration synchro PS: • nouveaux modules synchro(qque ms et stable) • compréhension synchro bunch PSB to PS!!!! Et PSB to dump • gamme de réglage phase au PSB insuffisante

  3. MD ON PSB • HOLLOW BEAM: création d’une dist. creuse avec C16(h=20) + blow-up puis bunching adiabatique avec C02(donne bunch plat) et accélération. Réglages fins mais stabilité obtenue et comprise…à suivre. • TOF: fourniture au PS de 2 types de faisceau • 8.5 1012 avec accél. et éjection H1+2 • 1..3 1011 R3 et 4..8 1012 R2 stable pour EastA/TOF • Haute intensité:>4 1013 avec 4 anneaux • ajustements quasi heuristiques des paramètres

More Related