1 / 27

Unified Development Ordinance Morrisville, North Carolina

Unified Development Ordinance Morrisville, North Carolina. Assessment Report / Outline May 2011. CLARION ASSOCIATES. Setting the Stage for a New Unified Development Ordinance. Do current regulations effectively implement the Land Use Plan and other adopted plans and policies?

tracy
Download Presentation

Unified Development Ordinance Morrisville, North Carolina

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Unified Development OrdinanceMorrisville, North Carolina Assessment Report / Outline May 2011 CLARION ASSOCIATES

  2. Setting the Stage for a New Unified Development Ordinance • Do current regulations effectively implement the Land Use Plan and other adopted plans and policies? • Zoning districts and land uses • Development standards • Procedures for approval

  3. Project Initiation, Research, & Analysis • Background document review • Initial project meeting • Stakeholder interviews and survey

  4. Work Plan and Schedule

  5. Contents of Assessment Report • Introduction • Assessment of Current Regulations • Annotated Outline of the New Unified Development Ordinance • Analysis of Current Development Regulations

  6. Assessment Report: Major Themes • Streamline the Development Review Process • Strike a Better Balance Between Flexibility and Creativity • Modify Zoning Districts to Implement the New Land Use Plan • Improve Development Quality • Increase User-Friendliness

  7. Theme 1: Streamline the Development Review Process • Differentiate between different types of development review • Issues: • Confusion between site plan approval and construction drawings • Uncertainty and delays in bringing small and straightforward projects without delay • Proposal: Offer two separate tracks • One-step: combined site plan and construction drawings (less cost for all parties) • Two-step: general sketch plan followed by detailed construction drawings (less up-front cost for developer)

  8. Theme 1: Streamline the Development Review Process • Delegate some review authority to staff or Planning and Zoning Board • Reduce reliance on special use permits and conditional rezonings • Formalize a staff development review committee • Provide a master plan option

  9. Theme 1: Streamline the Development Review Process • Establish standard review procedures

  10. Theme 2: Strike a Better BalanceBetween Flexibility and Creativity • Add an Administrative Adjustment Procedure • Add an Alternative Equivalent Compliance Procedure

  11. Theme 3: Modify Zoning Districts to Implement the Land Use Plan • Establish new activity center districts • Neighborhood Activity Center • Business Activity Center • Regional Activity Center • Community Activity Center

  12. Theme 3: Modify Zoning Districts to Implement the Land Use Plan Example Image Only – Not Morrisville Specific

  13. Theme 3: Modify Zoning Districts to Implement the Land Use Plan • New transit-oriented development planned development district • Convert current Agricultural district into very-low residential district • Add new multi-family residential district and consolidate single-family residential districts • Modify the corridor commercial district • Eliminate the neighborhood and general business districts

  14. Theme 4: Improve Development Quality • Add tree protection and canopy preservation standards

  15. Theme 4: Improve Development Quality • Broaden open space protections

  16. Theme 4: Improve Development Quality • Encourage sustainable development practices • Mandatory code requirements • Menu of optional sustainability features

  17. Theme 4: Improve Development Quality • Other issues addressed: • Increase parking flexibility • Expand building standards to cover multi-family and mixed-use

  18. Theme 5: Increase User-Friendliness • Consolidate multiple ordinances into a new UDO • Reorganize development regulations more logically • Add and enhance graphics • Use supplemental administrative manuals

  19. Annotated Outline of New UDO • General Provisions • Administration • Zoning Districts • Use Standards • Intensity and Dimensional Standards • Development Standards • Performance and Maintenance • Nonconformities • Enforcement • Interpretation and Definitions

  20. Next Steps in Preparing UDO • Develop UDO Drafting Options • Time • 1 year - consultant • 3 to 5 years - staff • Cost • 170k to have consultant draft (estimated) • 20k allocated in current fiscal year budget • Staff capacity • 20 to 40 hours a month

  21. Next Steps in Preparing UDO • Town Council Workshop • Present Options • Set Priorities • Streamline development review process • Strike balance between flexibility and certainty • Modify zoning districts to implement Land Use Plan • Improve development quality • Increase user-friendliness

  22. Next Steps in Preparing UDO • Town Council Workshop • Present Options • Set Priorities • Streamline development review process • Strike balance between flexibility and certainty • Modify zoning districts to implement Land Use Plan • Improve development quality • Increase user-friendliness green = draft from start to finishyellow = draft in small sections

  23. Drafting from Start to Finish(bullets in greenon the previous slide) Benefits Constraints No funding to hire a consultant to write the UDO Current staff capacity (if consultant is not hired) • Addresses all themes in the same timeframe • Most timely and efficient option (if consultant is hired) • Decreases likelihood of conflicting regulations • Allows staff to focus on core services (if consultant hired) • Reduces inconsistencies between land use plan and current development entitlements

  24. Preparing in Small Sections(bullets in yellowon the previous slide) Benefits Cons/Constraints Does not adequately address Streamlining the development review process(Theme 1) Adds another regulatory document which decreasesuser-friendliness (Theme 5) Costs more money and staff time Loss of revenue by delaying development, which increases the tax base Increases the likelihood of conflicting requirements • Uses existing resources (budget and staff) • Addresses specific issues: • Sign ordinance • Tree preservation (Theme 4) • Administrative Adjustment (Theme 2) • Alternative Equivalent of Compliance (Theme 2)

  25. Unified Development OrdinanceMorrisville, North Carolina Assessment Report / Outline May 2011 CLARION ASSOCIATES

More Related