1 / 30

Squadron PESTO Pillar Course

Squadron PESTO Pillar Course. Equipment. Personnel. Training. 30 June 2014. Introduction. This presentation covers the following topics:. Introduction - Objectives. At the end of this presentation, you will have a basic understanding of:

trella
Download Presentation

Squadron PESTO Pillar Course

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Squadron PESTO Pillar Course Equipment Personnel Training 30 June 2014

  2. Introduction This presentation covers the following topics:

  3. Introduction - Objectives • At the end of this presentation, you will have a basic understanding of: • The aviation squadron PESTO metrics and their authoritative data sources • The aviation squadron PESTO data flow to DRRS-N • The aviation squadron PESTO drill downs available in DRRS-N Note: The DRRS-N graphics used in this presentation contain notional data and are for illustration purposes only

  4. Overview - Authoritative Data Sources DRRS-N compiles unit resource values (called FOMs or Figures of Merit), using authoritative data sources. These values and associated data are available to the Commander as a guide for making unit assessments.

  5. Overview - Authoritative Data Sources • In the following slides, we will introduce the three PESTO pillars which are calculated within DRRS-N for all Aviation Squadrons. • Each section will discuss a specific pillar using the following format: • An overview of the pillar • The metrics, which drive the calculations of that pillar • The inputs (authoritative data source) and data flow to DRRS-N • The drill down analysis provided within DRRS-N

  6. PESTO Pillars - Personnel - Overview The personnel (P) pillar represents a detailed capture of individual skills that affect the ability of a unit to perform its mission. The personnel metrics in DRRS-N tie the BUPERS process to Fleet readiness.

  7. PESTO Pillars - Personnel - Metrics PFOM – Calculated for each NMET. The unit’s overall “P number” is an average of all individual NMETs. PFOM is the compilation of [requirements - gaps / requirements] in the following areas: • Active (AC) and reserve (RC) component officer and enlisted rating Fit • AC and RC enlisted NEC Fit • Government civilian Fit –generally not applicable to fleet units (no civilian billets on AMD) • T&E school requirements (as set out by the command in FLTMPS)

  8. PESTO Pillars - Personnel - Metrics View a sample (No-Weight) PFOM Calculation on the next page.

  9. PESTO Pillars - Personnel - Metrics Sample (No-Weight) PFOM Calculation: PFOM = (Rs – Gs) = (235 – 80) = Rs 235 66

  10. PESTO Pillars - Personnel - Inputs/Data Flow View Explanation of Terms on the next page.

  11. PESTO Pillars - Personnel - Inputs/Data Flow Explanation of Terms: NECNavy Enlisted Classification. A critical NEC manned less than 50% will automatically make a NMET red. NOBCNavy Occupational Billet Code RCNRating Control Number TFMMS Total Force Manpower Management System AQDAdditional Qualification Designator BA Billets Authorized COB Currently On Board DESIGDesignator FIT Billet to qualification match based on DESIG/NEC, Rank/Payband, and Subspecialty (AQD) FLTMPS Fleet Training Management and Planning System

  12. PESTO Pillars - Personnel - Drill Down Select the next slide to see the drill down

  13. PESTO Pillars - Personnel - Drill Down 77 93 271 62 77 PFOM = (Rs – Gs) = (271– 62) = Rs 271

  14. PESTO Pillars - Equipment - Overview • The equipment (E) pillar represents the equipment material condition for performing each assigned NMET and capability • Under DRRS-N, authorized aircraft (PAA) (the Supply resource in SORTSREPNV) and mission capable aircraft (the Equipment resource) are combined under the equipment pillar • Equipment largely based on the current readiness entitlement for aircraft and mission systems (deployed standard)

  15. PESTO Pillars - Equipment - Metrics • Red, yellow and green bands have been established for equipment “assigned and “ready” using the deployment phase as the standard for an MCO • Red, yellow and green bands have also been established for mission systems “assigned” and “ready” • Maintenance and Basic are red • Intermediate is yellow • Deployable is green

  16. PESTO Pillars - Equipment - Sample HS Metric 1. AMSRR supplies the data to the Aviation Data Warehouse (ADW) and AMFOM. 2. AMFOM uses the TMS-specific look up tables to determine aircraft and mission systems points-to-color relationships. 3. AMFOM also ties the equipment resources required to the capability (NTA). 4. DRRS-N displays the data in the E-pillar. Some drill down is available. 16

  17. PESTO Pillars - Equipment - Sample HS Metric 1. AMSRR supplies the data to the Aviation Data Warehouse (ADW) and AMFOM. 2. AMFOM uses the TMS-specific look up tables to determine aircraft and mission systems points-to-color relationships. 3. AMFOM also ties the equipment resources required to the capability (NTA). 4. DRRS-N displays the data in the E-pillar. Some drill down is available. 17

  18. PESTO Pillars - Equipment - Sample HS Metric 1. AMSRR supplies the data to the Aviation Data Warehouse (ADW) and AMFOM. 2. AMFOM uses the TMS-specific look up tables to determine aircraft and mission systems points-to-color relationships. 3. AMFOM also ties the equipment resources required to the capability (NTA). 4. DRRS-N displays the data in the E-pillar. Some drill down is available. 18

  19. PESTO Pillars - Equipment - Sample HS Metric 1. AMSRR supplies the data to the Aviation Data Warehouse (ADW) and AMFOM. 2. AMFOM uses the TMS-specific look up tables to determine aircraft and mission systems points-to-color relationships. 3. AMFOM also ties the equipment resources required to the capability (NTA). 4. DRRS-N displays the data in the E-pillar. Some drill down is available. 19

  20. PESTO Pillars - Equipment - Inputs/Data Flow

  21. PESTO Pillars - Equipment - Drill Down Select the next slide to see the drill down

  22. 72 PESTO Pillars - Equipment - Drill Down Deployed Entitlement(Point tables) Actual Available(AMSRR Data) Calculated Readiness

  23. PESTO Pillars - Training - Overview • The training (T) pillar represents the performance and experience of the Squadron for performing each assigned NMET and capability • NTIMS (the Navy Training Information Management System) calculates the values that are displayed in the T pillar of DRRS-N

  24. PESTO Pillars - Training - Metrics • CNAF developed a Capabilities-based T&R Matrix that supports DRRS-N by providing the basis for the Training Figure of Merit (TFOM) • TFOM is a function of two factors; Performance (Pf) and Experience (Ef) • TFOM metric is a measure that describes a unit’s training capability in a given NTA • SHARP allows squadrons to collect flight and training data and feed that data to the TYCOM and the DRRS-N T pillar View Performance (Pf) and Experience (Ef) Metrics on the next page.

  25. PESTO Pillars - Training - Metrics If Ef <1 and Pf is held at .80. Note: COB = Crews on Board SRS = Squadron Requirements Section Note: When Ef is less than 100, Pf is capped at 80. This prevents a unit from showing green in the T-Pillar unless all squadron level requirements have been completed.

  26. PESTO Pillars - Training - Inputs/Data Flow

  27. PESTO Pillars - Training -Drill Down 100 Select the next slide to see the drill down

  28. PESTO Pillars - Training -Drill Down Performance Factor Tab Experience Factor Tab

  29. Summary This presentation covered:

  30. Summary

More Related