1 / 7

Magnetotelluric in Greenland

Magnetotelluric in Greenland. Magnetotelluric in Greenland. Original plan: - ADU-07e with i nduction coils and electrodes (1-2 hours ) - EDL with induction coils and electrodes (1-2 days ) - EDL with Fluxgate and electrodes (1 month ). Magnetotelluric in Greenland.

treva
Download Presentation

Magnetotelluric in Greenland

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Magnetotelluric in Greenland

  2. Magnetotelluric in Greenland Original plan: - ADU-07e with inductioncoils and electrodes (1-2 hours) - EDL with inductioncoils and electrodes (1-2 days) - EDL with Fluxgate and electrodes (1 month)

  3. Magnetotelluric in Greenland

  4. Magnetotelluric in Greenland

  5. Magnetotelluric in Greenland • Problems: • EDL setup for 1-2 daysperiod • Foxes • Limited Metronix data

  6. Magnetotelluric in Greenland Data available: • Fluxgate = 10 stations with data from 11 days – 1 month • Electrodes = 9 stations with data from 1 hour – 1 month • Metronix 500 Hz = 2/3 stations 10-15 hours

  7. Magnetotelluric in Greenland

More Related