Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014. Ted Spence CCRAI R epresentative to Coalition for Equitable Water Flow (CEWF) and Member of the CEWF Executive Committee Cewf.ca. TSW Marine Assets.

trula
Download Presentation

Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014 Ted Spence CCRAI Representative to Coalition for Equitable Water Flow (CEWF) and Member of the CEWF Executive Committee Cewf.ca

  2. TSW Marine Assets

  3. Consider the Extremes of Our Reservoir Water level Experience in Recent Years • 2009- normal year except for very high water as ice went out causing shore damage • 2010- very little spring runoff and reservoirs did not fill until late July or early Aug. • 2012- much lower than average water levels beginning in late May • 2013 – very high spring and late fall levels from rainfall events. • 2014 – 200%+ of normal snowpack, late ice out date, and very high spring runoff on River.

  4. Mississagua Lake Levels 2014Dam Height with 8 Logs 2.44 m, Winter set 2 logs, Avg Ann Fluct 1.35 m.

  5. Mississagua Levels 2014

  6. Mississagua Dam April 18, 2014

  7. Mississagua Dam Friday 1:30 pmApril 19, 2014

  8. Mississagua Dam Friday 1:30 pmApril 19, 2014

  9. Mississagua Dam Friday 1:30 pmApril 19, 2014

  10. Mississagua Dam Friday 1:30 pmApril 19, 2014

  11. Our Intrepid Leader

  12. Lou Phillips Rd Washout 1:30 pm Friday April 18, 2014

  13. Friday Afternoon 3 Logs Replaced

  14. 9:30am Saturday

  15. Next Steps for CCRAI and CEWF • Develop a “Preferred Water Level” submission to CEWF as part of enhanced information for TSW • Present a draft “Preferred Water Level” proposal to CCRAI AGM in August for approval.

  16. Preferred Water Levels Example

  17. Important Link CEWF.ca for links to Parks Canada TSW water level site and TSW information TSW is also now on Facebook