Gas/Electric Coordination Meeting April, 2008. Bill Whaley Vice President Gas Control & Customer Service. Attached Megawatts (MW) 27,586 Total Max Load (MDth/d) 6,308 Total Contracted (MDth/d) Mainline Transportation 996. Spectra Energy Transmission Power Plant Attachments.
E N D
Gas/Electric Coordination MeetingApril, 2008 Bill WhaleyVice President Gas Control & Customer Service
Attached Megawatts (MW) 27,586 Total Max Load (MDth/d) 6,308 Total Contracted (MDth/d) Mainline Transportation 996 Spectra Energy TransmissionPower Plant Attachments
TETCO - Perulack/Chambersburg EastTop 25 Power Plant Summer Days
Number of Times Invoked Total Number of Days Required Texas Eastern 3 31 days Algonquin 3 38 days Maritimes & Northeast 3 38 days East Tennessee 1 21 days Order 698 Invoked During Winter 07/08 Spectra implements the requirement of receiving the hourly burn profile from directly connected electric power generation facilities only as operationally needed.