80 likes | 160 Views
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Closing Report March 06 Denver] Date Submitted: [9 March 2006] Source: [Reed Fisher] Company [Oki Electric Industry Co., Ltd.]
E N D
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Closing Report March 06 Denver] Date Submitted: [9 March 2006] Source: [Reed Fisher] Company [Oki Electric Industry Co., Ltd.] Address [2514 E. Maddox Rd., Buford, GA 30519 USA.] Voice:[1-770-271-0529] E-Mail:[reedfisher@juno.com] Re : [] Abstract:[Description of TG3c March 2006 meeting proceedings ] Purpose:[Report to 802.15 Closing Plenary Meeting, 10 March 2006] Notice :This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. R. Fisher, Oki Electric Industry co. Ltd
TG3c 6th Meeting (Denver) Closing Report 10 March, 2006 R. Fisher, Oki Electric Industry co. Ltd
08:00 7 March. Call to order. • TG3c Leadership: Chair: R. Fisher. vice Chairs: H. Ogawa, A. Mathew Secretaries : H. Ikeda, S.K Yong • 3. Attendance: • total 64 attendees • Eight 2-hour time slots were allocated initially. Anadditional 1 slot was allocated at the meeting. (Nine 2-hour slots total) • 5. 15:30 9 March. Meeting adjourned R. Fisher, Oki Electric Industry co. Ltd
Meeting Accomplishments R. Fisher, Oki Electric Industry co. Ltd
Contribution List R. Fisher, Oki Electric Industry co. Ltd
Plan to Get to Baseline Document 05/311r6 • 03/06 (Denver, CO)– Reviewed CFP. Continued channel model analysis. Continued development of UMD including MAC related system attributes. Future plan: • 05/06 (Jacksonville, FL) – Complete channel model analysis, begin drafting of channel model document. Continue development of UMD including MAC related system attributes. • 07/06 (San Diego, CA) – Finalize channel model document. Finalize UMD, including MAC related system attributes. Finalize Technical Requirements. Issue CFP. • 09/06 (Melbourne, Aus.) – Continue MAC discussions and make recommendation for MAC development. • 11/06 (Dallas, TX) – Final proposals due 1 week prior to meeting, begin presentations of all proposals. • 1/07 (London, UK) - Down selection begins, begin drafting standard. <author>, <company>
Ballot plan 05/311r6 • 03/07 –First letter ballot • 05/07 – Re-circulation • 07/07 – 802 Sponsor ballot • 09/07 – 802 Sponsor re-circulation • 11/07 – Standard finished. <author>, <company>
TG3c Timeline R. Fisher, Oki Electric Industry co. Ltd