An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Let Us Close The Environment Circle! O Biogas

  2. Biogas is a Multitalent ! Input Process Output • Organic Waste • Regrowing Mat. • from Agricalture • from Food Industie • from Householdwaste • from Ethanol/Starch/CPO • Combinations • Biogas • Electrical Power • Heat- / Cooling Energy • Natural Gas…Gasoline? Anerobic Fermentation • Flowchart • Obstacles • Organic Fertilizer • Reduce CO2 Emission • Examples • Example: • Manure Cow/Pig

  3. INPUT Manure Exampel

  4. Biogas From one Cattel/Pig… !! Fast degration (aerobic) => Fresh Collection !! = 15 m3 Manure / Cattle p.a. (in Europe 20 m³) = COD load 50 -100 000 ppm = 450 m3 Biogas p.a. = approx. 900 kWhel p.a. = 70% COD Reduction One pig produces energy equivalent to 23 l/year of diesel oil.

  5. Process Nature as an Example Flow Chart Obstacles & Solutions Examples

  6. Let us take the nature as a good example! 1. Fermenter 2. Co-Fermenter 3. Residue Storrage Fermenter Tank = Big Cow Stomach

  7. Flow Chart of a Biogas Plant

  8. Process Some Typical Obstacles and our solution to that.

  9. Obstacle 1 – Low Operation Know How – Solution … Error Management and Monitoring, Operation Look Book, Reporting in Diagramms, incl. CHP Data Mobile Messing For Impotant Error …Automated Operation System

  10. Obstacle 2 – Instable Gasyield – Solution… BSS 12 Years Data Base, 300 Plants …Regular Analysis of Substrate Technical ONLINE Support Monitoring Biogas Inhibitors in Manure: - Antibiotcs (prevention, treatment of deasese) - Disinfectant (e.x. desinfection of the cot) - Solvents (e.x. cleaning-, paint works on the cot) - Herbicide, Insecticide oder Bactericide (e.x. intake from feedstock) Biogas

  11. Obstacle 3 – Operation in Winter – Solution… Proper Heating Coil System Tank Insulation according to Climate

  12. Obstacle 4 – To High H²S – Solution… Internal biolog. DesulfurisationSystem Hidrogen Sulfide Content! Some Case: + …Iron Chloride or + External Deslufurisation

  13. Obstacle 5 – Layer Scrum + high DM – Solution… …Flexible Submersile Mixer - Drymatter 5% to 25% • Low Maintenance Horizontal Adjustable . . . . Vertical Turnable Vertical Liftable

  14. Obstacle 6 – High Maintenance Level – Solution… 10 Min. Opening of Fermenter during operation Central Operation Plattform ….12 years optimized own operation + security parts Sandproblem in Manure? Solution by tank size extention and simple sedimentation. Empty after 2-8 years with Skid Loader Weather Protection Foil Feeding Level protection Over+ Under pressure safeguard Air Support Fan Gas Collection Foil Gear protection system Gas Storage Level Indocator View Holes

  15. Examples • Biogas Plants • Manure • Gaspurification • Large Size

  16. Biogas PlantMilchcenter Dorfheimat Technical Data Start of operation: 2007 Capacity: 500 kWel Input material: 109 m3 liquid manure (~ 1,600 dairy cows), approx. 5.5 t solid Manure and approx. 3 t corn silage Residue storage tank Digester Post-Digester CHP container

  17. Biogas Plant BiRo GmbH Technical data Start of operation: First quarter 2008 Capacity:300 m³/h Purification from Biogas to Bio Methane (fed into the Natural Gas Grid) (this corresponds to 600 m³ biogas und 1,2 MWel) Input: Corn silage More information:www.bbfm.de

  18. Biogas Plant in Bad Oldesloe Technical data Start of operation: 2007 Capacity:2.1 MWel. Micro gas distribution system with four CHPs : - One CHP at the biogas plant • Three decenralized CHPs in 1,6 km distance Input: Corn silage Thermal use: Supply of Farm und two external industrial factories

  19. MT-Energie in facts • Solid knowlege, with 12 years building experience in biogas plants • In total 60 MW of installed electrical capacity by 2007 • Onlinedata from 300 different biogas plants were we provide continious biological consulting • Until now we built 140 biogas plants, ALLin operation with an average running hour per year of 94% • International Business in Italy, France, Spain, Czeschia, Hungary, Kroatia, Thailand, China.

  20. Thank you for your kind attention! China Office Beijing: +86 10 6296 7662 Mrs. Wang Zhen, (Executive Adviser) WangZhen_de@yahoo.com.cn Mr. Zengbin Qi, (Ing. Biotechnology) Zengbin.Qi@MT-Energie.com China & Germany …Mmm Every Drop collected for MT-Energie…Muuuh! Headoffice: Markus Dicke, Director Asia Markus.Dicke@MT-Energie.com+49 172 64 97 110Germany