1 / 18

Jose F. Salt Cairols Instituto de Física Corpuscular ( Valencia ) IFIC

Task4.3 Infrastructure Support WP4:InternationalTestbed Organisation (http://ific.uv.es/grid/CROSSGRID-IFIC/). Jose F. Salt Cairols Instituto de Física Corpuscular ( Valencia ) IFIC C onsejo S uperior de I nvestigaciones C ientificas. Contents. Goals Partners & Human Resources

tybalt
Download Presentation

Jose F. Salt Cairols Instituto de Física Corpuscular ( Valencia ) IFIC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Task4.3 Infrastructure SupportWP4:InternationalTestbed Organisation(http://ific.uv.es/grid/CROSSGRID-IFIC/) Jose F. Salt Cairols Instituto de Física Corpuscular (Valencia) IFIC Consejo Superior de Investigaciones Cientificas

  2. Contents • Goals • Partners & Human Resources • Concrete Contributions • Relationship with DATAGRID Project • List of deliverables • Timetable • Summary

  3. Goals • Study of available tools for Fabric Management for GRIDs • To define an User Support and Help Desk for the collaboration • To provide Installation Kit • Network Support

  4. Partners • Partners: • CSIC • FZK • UCY • UAB • USC • AUT • LIP

  5. FZK (Karlsruhe): H. Marten UAB (Barcelona): A. Pacheco AUTh (Thesaloniki): C. Petridou LIP (Lisboa): J. Gomes UCY (Cyprus): M. Dikaiakos USC (Santiago de Compostela): A. Gómez (CESGA) CSIC(Spain) J. Marco (IFCA,Santander) J. Salt (IFIC, Valencia) A. Fuentes(RedIRIS,Madrid) Partners (II):Contact personsChecking

  6. Human Resources(102 PM)

  7. Minimal Infrastructure • Minimum hardware for the deployment if a local X# testbed site: • GIIS(Grid Index Information Service) machine, • dedicated 100 Mbps switch • 3 machines (standard type, double processor Intel compatible > > >1GHz, 512 Mb RAM, HD40GB) • One CA (Certification Authority) machine per country • Registration Authority web Server and LDAP server ( 1 per country) • Dedicated gatekeeper ( 1 per site) • Dedicated network monitoring system ( 1 per site) Cost = 180 KEur

  8. Concrete contributions • Fabric management in an interactive framework • Help desk • Close interaction with the National Network providerspromotion & development • Prepare the Installation Kits

  9.  Help Desk (I): Discussion • First step: to have a list of the features to be fullfilled by the HD software: • which kind of services? • Free or paying? • Only for WP4or for the whole Collaboration? • To include a section of F.A.Q. ( Frequent Asked Questions)? • ...

  10. Help Desk (II): First ideas(CSIC will be the responsible of maintaining the Help Desk) • To follow the evolution of a given question • to generate installation recipes • to have access to tutorials • To build a Knowledge Data Base • Fast links to different services • Bug tracking system

  11.  Installation Kit • CSIC will be responsible for the testbed kit release • UCYand AUTh will work on the impact of the changes related to new releases • simplify the coexistence of different software releases

  12. Network Support (I): Objetives(LIP: Responsible of this subtask) • Monitoring Tools • To Establish a shared resource called • Network Element (NE) • To collaborate with the Network Service Provider • in designing specific network services • by mapping the application/middleware requeriments to network services (QoS, Multicast,etc)

  13. Network Support (II): Strategy • Year 1: • Network requeriments studies • Network connectivity/capacity evaluation • Initial network monitoring architecture • Year 2 and 3: • Optimize the monitoring architecture • Performance optimization • Grid Traffic monitoring tools • Year 3:

  14. Relationship with DATAGRID • To assure interoperability with DATAGRID testbed • to take profit of the expertise of the DATAGRID project: • WP4 (Fabric Management) • ‘Porsuit’ X# people: Poznan, Karsruhe • WP6 (Testbed and Demonstrators) • Installation Kit  to adapt it / to create our version? • ‘Porsuit’ X# people: R. Marco, J. Gomes • WP7 (Network Services) • Network management • ‘Porsuit’ X# people: Lisbon

  15. List of Deliverables(Year 1) • D4.1,report, month 3, ‘Detailed planning for testbed setup’, May’02 • Infraestucture,manpower and network resources review at each site (ALL) • definition of site expertise and special hardware infraestrucure (Mass storage, specific platform?) (CSIC) • Interoperability/coordination with DATAGRID (FZK) • User support and Helpdesk requirements (CSIC) • D4.2, prototype, month 6, ‘First testbed setup on selected sites’, August’02 • Installation kit and documentation web site (CSIC) • Setup of repositorty software and Helpdesk at CSIC • D4.3,R, month 9, ‘WP4 status internal report’ November’02 • General status on the testbed setup status with specific sections • D4.4,P, month 10, ‘First testbed prototype release ’, December’02 • Installation kit and documentation web site update (CSIC) • Update of repository software and Helpdesk at CSIC

  16. First 3 months: review and setup the local infraestructures to provide a Help Desk reinforce connection with DATAGRID Months 4-6 Prepare Installation Kit Prepare Help Desk setup Months 7-10 Update Installation Kit Extend HD support Report on experience Timetable (I)

  17. Months 11-21 Update Installation Kit Consideration of special hardware requirements from application side Months 22-30 Update Installation Kit Consideration of realistic requirements from application side Months 31-36 Final testbed with integration of applications Timetable (II)

  18. Installation Kit: do we need to adapt or to create a new version? Interactive environment Help Desk: appropriate product points to be covered Network support: to define the model Dependencies with other WP’s in CROSSGRID Interoperability with DATAGRID Summary

More Related