An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Determining Ordinary High Water Corps of Engineers and Dept. of State Lands Jurisdictional Determinations on non-Tidal WaterwaysACEC Frannie Brindle 503 986-3370 Natural Resource Unit Manager, ODOT Technical Services

  2. Dept. of State Lands and Corps of Engineers

  3. OHW is Defined by Field Characteristics

  4. Drift material (or wrack) in fence? Clear line impressed along shore? Antelope Creek, Jackson Co. March 2006

  5. Field Characteristics Culvert staining–not appropriate for determining fish passage design criteria

  6. Relation to Other ‘Lines’ • 2-year flood elevation • Calculated based on modeling • OHW is usually lower on the bank than the 2-year • Bank full stage • Often used interchangeably with OHW in literature • Channel forming flows • Defined by DSL as the two-year recurrence interval flood elevation • Edge of Water • Top of bank • Easily identifiable on some streams • OHW is usually below the top of the bank

  7. Context In-water work timing Resource Impacts Fish Passage Design

  8. Procedures • Flag OHW in field (flag only one side of stream if access is limited and project line to the other side in CAD) • Use painted stakes or flags where possible • Take photos up- and down-stream showing flag placement

  9. Procedures (cont) • Complete form: • OHW field characteristics observed • If 2-year used instead, should be stated • Develop site sketch showing flag locations, photo-points • Final Documentation includes OHW Determination Form, Photos, Site Sketch

  10. Completing the Form

  11. Sample Site Sketch Steep bank- visible indicators Low hanging vegetation- willows, other riparian 3 flow 2 P1 P2, 3 1 Elevation point 4 N