1 / 2

Power Systems

Power Systems. Operational Period LETS will be 365 days Power Required Systems Cyclopes Lander Telemetry Communication Thermal systems Instrumentation Ascent and descent operations Caution and warning systems Power conditioning Regulate power Power storage Power Supply Options

tyne
Download Presentation

Power Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Power Systems • Operational Period • LETS will be 365 days • Power Required Systems • Cyclopes Lander • Telemetry • Communication • Thermal systems • Instrumentation • Ascent and descent operations • Caution and warning systems • Power conditioning • Regulate power • Power storage • Power Supply Options • Solar Cell • Battery • RTG • Looking at 1-2 SRG and 6-8 Li-ion at this time or something similar. Also still going over the options above and trying to get a more creative design but this is a safety net for now.

  2. Advantages ASRG/SRG (Nuclear) Constant Power Supply Thermal Output can be utilized for thermal systems Requires Fewer Batteries Solar Panels Minimize Cost High Power to Weight Ratio Clean Energy Politically Safe Disadvantages ASRG/SRG (Nuclear) Political Affairs Nuclear Waste Hazardous / Contamination Expensive Solar Panels Degrade Over Time Non-constant Power Supply No Thermal Output Susceptible to Lunar Environmental Conditions Requires Many Batteries Power Systems

More Related