Project TX 0-5566. District Questionnaire (October 16 2008). Strategies to Improve and Preserve Flexible Pavement at Intersections. UTEP - Soheil Nazarian Imad Abdallah. Do your pavements experience distress at the intersections of low volume roads?.
E N D
Project TX 0-5566 District Questionnaire (October 16 2008) Strategies to Improve and Preserve Flexible Pavement at Intersections UTEP - Soheil Nazarian • Imad Abdallah
Do your pavements experience distress at the intersections of low volume roads?
Do your pavements experience distress at the intersections of low volume roads?
Do your pavements experience any type of distress at the intersections of low volume roads?
What the severity level at the intersections of low volume roads?
What distress types are common at your intersections on low volume roads?
If rutting is an issue at intersections, please select probable causes: (check all that apply)
Typical Performance Period for Selected Remediation Strategies (Rutting)
Typical Performance Period for Selected Remediation Strategies (Cracking)
Typical Performance Period for Selected Remediation Strategies (Pushing)
Typical Performance Period for Selected Remediation Strategies (Shoving)
Project TX 0-5566 District Questionnaire 2 (April 2009) Strategies to Improve and Preserve Flexible Pavement at Intersections UTEP - Soheil Nazarian • Imad Abdallah
Results of Whether the Districts Have a Count on the number of intersection in the District
Results of Whether the Intersection are Treated Differently Than the Remaining Part of the Road
Results of Whether Road Condition are Better Away From the Intersection
Results of Pavement Layer That Most Probably Contribute to Distress
Type of Preliminary Information used for selecting best Remediation Strategies 1. In some cases.2. If possible install signs that indicate the presence of stop.3. And cross traffic especially truck traffic.4. Where the intersection is at…to see if the problem is continual throughout the stretch or not.5. Review existing pavement structure and whether it was stabilized or not.6. (1)Review old set of plans and generally core to determine typical sections, (2) Check with maintenance section for repair history/problems at location.7. Low heavy loads.8. Buy the sign crew field book.9. Whole intersection.10. 55MPH.11. Hot Mix 2 in CMHB.12. We do all of the following by having cores and traffic analysis done.
Remediation Process and Unit Cost Associated with Each Process
Additional Information Gathered for Design and Construction 1. Generally FWD.2. DCP, Tri-Axle.3. FPS 19.4. Remaining life analysis from TTI.
Decision Making Process in Terms of Selecting Candidates for Maintenance and Rehabilitation
Type of Information Gathered to Select the Maintenance or Rehabilitation Method
Results of whether Life cycle Cost Analysis is Used in the Decision/Selection Process
Treatment Flexible Pavement Treatment Selection Options (Bryan District) Distress
Flexible Pavement Treatment Selection Options (Atlanta District)
Flexible Pavement Treatment Selection Options (Laredo District)
Flexible Pavement Treatment Selection Options (Abilene District)