1 / 33

Managing Regulatory Inspections using Quality Plans in EAM

Managing Regulatory Inspections using Quality Plans in EAM. Terry Hughes Senior Principal Consultant Impac Services. Mine Safety & Health Administration MSHA inspections Current Legacy system (being replace by Oracle EAM) Activities PM Schedules & generation

tyrell
Download Presentation

Managing Regulatory Inspections using Quality Plans in EAM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Managing Regulatory Inspections using Quality Plans in EAM Terry Hughes Senior Principal Consultant Impac Services

  2. Mine Safety & Health Administration MSHA inspections Current Legacy system (being replace by Oracle EAM) Activities PM Schedules & generation Enter inspection results Manually create follow-up work Excel Maintain check sheets

  3. Task Combine it all in one system Automate the follow-up work creation Prerequisites Asset setup Activity created and assigned (Diesel Permissibility) PM schedules Steps Create quality elements Create quality plan Work order is generated Complete quality plan on parent work order Outcome Check lists are created and maintained in Oracle A follow-up work order is automatically created for any inspection step which fails inspection

  4. Element 1

  5. Element 2

  6. Element 3

  7. Add wo printout before

  8. Summary MSHA Regulated Inspections Prerequisites Asset setup Activity created and assigned (Diesel Permissibility) PM schedules Steps Create quality elements Create quality plan Complete quality plan on parent work order Outcome: A follow-up work order is automatically created for any inspection step which fails inspection

  9. Questions Terry Hughes Senior Principal ConsultantImpac Services thughes@impacservices.com

More Related