CENTRE OF ENERGY STUDIES AND RESEARCH Devi Ahilya University, Indore. WELCOME . PROGRESS REPORT 2009-2011. CENTRE OF ENERGY STUDIES AND RSEARCH Devi Ahilya University, Indore. CENTRE OF ENERGY STUDIES AND RESEARCH.

ugo
Download Presentation

CENTRE OF ENERGY STUDIES AND RESEARCH Devi Ahilya University, Indore

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CENTRE OF ENERGY STUDIES AND RESEARCHDevi Ahilya University, Indore WELCOME

  2. PROGRESS REPORT2009-2011 CENTRE OF ENERGY STUDIES AND RSEARCH Devi Ahilya University, Indore

  3. CENTRE OF ENERGY STUDIES AND RESEARCH The Centre of Energy Studies and Research (CESR), an autonomous organization established by Devi Ahilya University, Indore and Madhya Pradesh Urja Vikas Nigam Ltd., Bhopal in December, 1989 to serve energy related academic, research and development needs in the state of Madhya Pradesh. CESR registered as a society under the Society Registration act (1973), is academically a part of Devi Ahilya University, Indore under the faculty of Engineering Sciences and based at its Khandwa Road Campus of Devi Ahilya University, Indore.

  4. ACTIVITIES CARRIED OUT (2009-2011) 1. Energy Audit/Energy Conservation Projects 2. Activities under the Biogas Development Training Centre 3. Training Programme on Improved Chulha 4. Physical Verification of Solar Photovoltaic based Home light and Street Light systems in the Remote Villages Electrified under the govt. scheme 5. Testing Programme 6. DPR’s Prepared 7. Educational and Training Programme 8 Other Achievements 9. Future Objectives 10. Project Proposal submitted 11. Limitations

  5. 1. DETAILDED ENERGY AUDIT OF M/s Zenith Birla Steel Plant at Khopoli, Mharastra • Savings identified in terms of electricity = 763196 kWh/yr • Savings worked out in terms of money = Rs. 49.22 lacs/yr • Investment = Rs. 20.86 lacs • Payback period = 5 months 1.Energy Audit/Energy Conservation Projects

  6. Energy Audit/Energy Conservation Projects 2. DETAILED ENERGY AUDIT OF 132 KV/25 KV TSS, Sub Station, GURLA (WC Railway, Near Kota) • Savings identified in terms of electricity = 7104066.80kWh/yr • Savings worked out in terms of money = Rs. 396.71 lacs/yr • Investment = Rs. 25.00 lacs • Payback period = 1 month

  7. 2.Activities under the Biogas Development and Training Centre (BDTC) • Following activities has been carried out under the programme in M.P. and Chhatisgarh

  8. Activities under the Biogas Development and Training Centre Photographs of Construction cum Maintenance (CCM) Trainings at various sites

  9. Activities under the Biogas Development and Training Centre Photographs of Turn key workers (TKW) Training Programmes at CESR

  10. Activities under the Biogas Development and Training Centre Photographs of Staff Training Programmes for various agencies

  11. Activities under the Biogas Development and Training Centre Photographs of User’s Training Programmes in different villages

  12. Activities under the Biogas Development and Training Centre 1. Literature Developed • 2.RENOVATION OF CUT MODELS AT THE CENTRE

  13. Activities under the Biogas Development and Training Centre • Other Activities 1 A Detailed Project Report of 25 M3 based on Kitchen Waste Biogas Plant at Daly College, Indore prepared and submitted to MPUVN.   2. Physical Verification Work of Biogas Plants Installed by M.P.UrjaVikas Nigam in the year 2008-09. 265 plants physically verified and report has been submitted to the Nigam.

  14. 3.Training Programme on Improved Chulha • A 7 days Training Programme on Improved Chulha was conducted by our Centre for Bio-Ray Organization, Kasrawad, District Khargone. 10 participants including women were trained. The organization set a target of installation of 2500 Chulhas in the rural area around.

  15. Training Programme on Improved Chulha

  16. 4.Physical Verification work of Remote Electrified Villages through SPV systems The Centre has carried out Physical Verification work of 2457 House Holds (100% basis) in 22 villages for the Solar Photovoltaic Systems installed by the M.P. UrjaVikas Nigam, Bhopal. Status report has been submitted to the nigam.

  17. Physical Verification work of Remote Electrified Villages through SPV systems We have applied for the Physical Verification work of Remote Villages Electrified by the MPUVN and our rates are found to be the lowest in tendering procedure. Work order for the 20 districts is to be received.

  18. Physical Verification work of Remote Villages Electrified Villages through SPV systems Photographs of SPV Systems installed in the villages

  19. 5. Testing Programme The Centre is providing Test facilities for Fuel, Reflectivity and Emissivity Test of Paints, Gasifiers and Testing of Energy Efficient Lighting systems to many industries. Main clients are: • M/s Berger Paints • M/s ICI India Limited • M/s KansiNerolac Paints Ltd. Mumbai • M/s Ipca Lab. Aurangabad • M/s Paschim Chemicals, Aurangabad • Shri Krishna Agro Engineering, Indore • M/s CIMS Power Technologies Pvt.Ltd., Bhopal • M/s K.K. Project and Engineering, Bhilai

  20. We are appointed as technical consultant by the Nagar Nigam, for the preparation of Detailed Project Report to develop Indore as Solar City under the “Solar City” development programme of the Ministry of New and Renewable Energy, Govt . of India , New Delhi. DPR has been prepared and submitted to the IMC for further processing at their end. 6. DPR preparation for Solar City, Indore

  21. DPR Preparation for 35 kWp grid connected SPV system for Ajmer VidyutVitran Nigam Ltd. • We have been allotted the work to prepare DPR of 35 kWp grid connected SPV system by the Ajmer VidyutVitran Nigam Ltd. DPR preparation for the same is in progress and the report will be submitted soon.

  22. We have prepared a DPR for Renovation of Street Light Network with energy efficient lighting network at I/IA,II, III and Kheda Growth Centre, Pithampur for M.P. AudyogikVikas Nigam, Indore. 2700 number of street lights are to be replaced with the energy efficient lighting systems. Report has been submitted to the MPAKVN. DPR Preparation for Renovation of Street Light Network

  23. 7. Educational and Training Programmes The MNRE had set-up an Energy Park at CESR. The Park is a unique facility for demonstration of different renewable energy gadgets. A number of students, visitors, faculties and general public visit the park.

  24. 8.Other Achievements and Activities • Centre is listed as Consultant for Development of Solar City by the Ministry of New and Renewable Energy, Govt. of India, New Delhi. • Centre has been approved as Certified Energy Auditing Agency by the MPUVN on its panel. • The Centre is supporting its sister concern School of Energy and Environmental Studies in their academic programmes i.e. M. Tech. (Energy Mgmt.) , M. Phil, (Energy and Environmental Mgmt.) and Ph.D. Programme.

  25. The centre aims at main thrust on the following Areas for fund generation: • Energy Audit and Energy Management Projects in Industries,Commercial and Residential Building sectors. • Third Party Verification for various agencies. • Biogas based Power Generation projects. • Testing of Fuels, Water, Solar Energy Devices etc. 9. Future Objectives

  26. Following Project Proposals have been submitted for funding:- • Project on Modification Engine for Producer gas, submitted to MNRE • Regional Testing Centre for Biomass Gasifier • Detailed Energy Audit of Bhopal,Habibganj, Itarsi and Makronia Railway Stations. • One day Awareness and Training Programmes on Remote Village Electrification in district Raisen, Gwalior and Hoshangabad for the field functionaries, villagers and beneficiaries; submitted to MNRE through MPUVN 10. Project Proposals Submitted for Funding

  27. 11. Limitations Due to short of funds, the Centre is facing hardship and couldn't fill vacant positions and hence limits to achieve its set objectives. Present position of the staff is as under:

  28. CENTRE OF ENERGY STUDIES AND RESEARCH, DAVV, INDORE THANK YOU