GLAST LAT Tracker Tower16 Pre-Ship Review

GLAST LAT Tracker Tower16 Pre-Ship Review. Luca.latronico@pi.infn.it INFN-Pisa. Tower 16 - Assembly and test highlights. tray17 replacement. October 25-28, 2005 (INFN-Pisa) : assembly of complete tray stack (15 non-flight trays) complete cable set (3 non-flight cables)

ulla-burt
Download Presentation

GLAST LAT Tracker Tower16 Pre-Ship Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GLAST LAT Tracker Tower16 Pre-Ship Review Luca.latronico@pi.infn.it INFN-Pisa

  2. Tower 16 - Assembly and test highlights tray17 replacement • October 25-28, 2005 (INFN-Pisa) : • assembly of complete tray stack (15 non-flight trays) • complete cable set (3 non-flight cables) • sidewalls, alignment • No environmental tests performed • No Solithane, No EMI taping • Full EIDP details at: • http://glast.pi.infn.it  TOWER 16 is a spare, non-flight module and will be used for calibration studies tray to be replaced

  3. Tower 16 – configuration details Tower PN: LAT-DS-00722 (rev3) Tower SN: 16 18 non-flight trays: • 5 from tower0 – some needed rework • 4 from flight towers 1,14,7,8 and showing anomalies at high T and/or vacuum – removed and reworked where necessary • 1 with anomalous GTFE • 5 with minor mechanical problems 3 non-flight cables: • C0-023, C6-008, C7-009 4 non-flight sidewalls: • EM laminate • 50 mm Al on ext. surface • pocket for extra-thick closeout out of specs Tracked in NCR INFN/PI 593

  4. Tower 16 – functional test details issues to deal with when testing layers with more than 16 bad chans or rare anomalies 3 9 Tracked in NCR INFN/PI 594 Overall bad channels

  5. Tower 16 – efficiency performance Average tower efficiency is 99.5% (waiting enough for FE2 on Y11 to warm-up and taking into account also Y15 with ~160 bad chans)