1 / 13

EQC Increased Flooding Vulnerability

EQC Increased Flooding Vulnerability. CAG overview 22 July 2014. Outline. EQC land cover IFV – what it is and what it isn’t General IFV criteria Flood modelling Assessment process Settlement process Next steps. EQC Land Damage Cover. EQC land cover. Land Under building

ulric-logan
Download Presentation

EQC Increased Flooding Vulnerability

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EQC Increased Flooding Vulnerability CAG overview 22 July 2014

  2. Outline EQC land cover IFV – what it is and what it isn’t General IFV criteria Flood modelling Assessment process Settlement process Next steps

  3. EQC Land Damage Cover EQC land cover • Land • Under building • 8m around building & structures • main access within 60m of dwelling • Bridges and culverts in the land above • Retaining walls within 60m of building and supporting the building or land as above

  4. EQC land cover

  5. Increased Flooding Vulnerability IFV is • a physical change to residential land, that is • a result of the earthquakes, which • adversely affects the uses and amenities of that land, by • increasing the vulnerability of that land to flooding events. Changes to the insured land that result in it becoming more vulnerable to flooding as a direct result of the earthquakes are covered by EQC.

  6. Not IFV • Flooding that occurred pre-earthquake sequence, or • Increases in flooding due to changes to offsite drainage due to earthquakes, or • Increases in flooding due to changes in streams and rivers offsite.

  7. General IFV Criteria The flood depth has increased by 200mm or more as a result of the Canterbury earthquake sequence, and The flood depth has increased by 100mm or more as a result of a single earthquake event, and The land has suffered observed damage as a result of the Canterbury earthquake sequence, and The change in flooding vulnerability has caused the value of the property to decrease.

  8. Earthquake Events • 4 September 2010: 7.1M • 22 February 2011: 6.3M • 13 June 2011: 6.4M • 23 December 2011: 6.2M Changes in ground levels Pre-September 2010 LiDAR surveys 5 different sets Cross Section Surveys For priority waterways Post-September 2010 Post-February 2011 Post June 2011 Post-December 2011

  9. IFV Assessment Process

  10. Next steps • Ground truthing • Valuation • Declaratory Judgement • Possible settlement approaches • Diminution of value • Contributing to CCC offsite flood mitigation works.