1 / 22

SPX - Cavity WBS U1.02.01.02.05, U1.03.03.05, U1.03.03.12

SPX - Cavity WBS U1.02.01.02.05, U1.03.03.05, U1.03.03.12. Genfa Wu SRF Scientist Accelerator Systems Division/RF Group DOE Lehman CD-2 Review of APS-Upgrade 4-6 Decem ber 2012. Outline. WBS Scope of SRF Cavities for SPX Requirements Design Risks considered ES&H Cost Schedule

umay
Download Presentation

SPX - Cavity WBS U1.02.01.02.05, U1.03.03.05, U1.03.03.12

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SPX - CavityWBS U1.02.01.02.05, U1.03.03.05, U1.03.03.12 • Genfa Wu • SRF Scientist • Accelerator Systems Division/RF Group • DOE Lehman CD-2 Review of APS-Upgrade4-6 December 2012

  2. Outline • WBS Scope of SRF Cavities for SPX • Requirements • Design • Risks considered • ES&H • Cost • Schedule • Summary DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  3. SPX Cryomodules / Cavities Scope and WBSU1.02.01.03 & U1.03.03 • Fabricate, process and test 8 deflecting cavities for two SPX cryomodules • Attach helium vessels to cavities and qualify the cavities for string assembly DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  4. HOM Damper Deflecting Cavity and Tuner LOM Damper HOM Damper Mark-II CCA3 design Input Coupler DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  5. Cavity Fabrication, Processing and Testing • Large grain ingot slicing • Niobium RRR  300 • CNC machining • Chemical etching/polishing • E-beam welding • Chemical polishing (BCP) • Hydrogen bake out at 600C 10 hours • Light chemical polishing (BCP) • HPR/clean room assemble • Low temperature baking • Vertical testing • Helium vessel dressing • Vertical testing • Horizontal testing (optional) DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  6. Deflecting Cavity Performance • CCA2 used indium seal • CCA3-1 used Al/Mg seal • CCA3-1 used Al/Mg + Be/Cu RF shield • LOM coupler Qext was sensitive to the coupler symmetry (solved) • Heating on Al/Mg gasket and RF shield limits performance • Particulates in high surface B field area Further processing and test • Additional HPR • Better RF shield • Or adopt indium seal Mark-II Cavity CCA2 exceeds the gradient and Q0 specification DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  7. Cavity Vacuum Seals HOM Damper LOM Damper • Cavity flange ports use Al/Mg seals on round flanges • Broad band RF transmission requires RF shield to remove the RF pocket HOM Damper Magnetic field in LOM coupler Input Coupler FPC/HOM LOM DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  8. SPX0/SPX Helium Vessel Design Helium Return Nitronic Rod Mount Tuner Attachment Points Helium Supply DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012 Slide from K. Wilson

  9. SPX0/SPX Tuner Design DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012 Courtesy of Joe Matalevich

  10. SPX0/SPX Tuner Design Status: Cavity Measurements • SPX Cavity (CCA3-1) Exercised in Modified JLAB Tuner Test Stand • Cavity instrumented with 4 strain gages • Axial Force, Length, and Frequency measured as cavity stretched Courtesy of Joe Matalevich DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  11. SPX0/SPX Tuner Design Status: Cavity Measurements • Modeling Validated Courtesy of Joe Matalevich DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  12. Horizontal Test Stand • Horizontal cavity test at ANL/ATLAS • 5 kW amplifier • 64 W Cooling @2K • Analog and Digital RF • Verify helium vessel and tuner design • Test LLRF control • Measure RF noise • Measure microphonics • Test fast detuning Horizontal test of a dressed cavity is scheduled in December 2012 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012 Courtesy of Joel Fuerst

  13. SPX Cavity Risks • Cavity gradient and Q0 degradation • We plan to use other processing and state of art post processing methods to both increase gradient limit and Q0. DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  14. SPX Cavity ES&H • Integrated Safety Management System (ISMS) • APS-U Project following Argonne’s ISMS program requirements • Argonne Integrated Safety Management System (ISMS) Description recently revised and submitted to DOE ASO • Describes framework for integrating ESH requirements with mission objectives • References Argonne LMS procedures which implement specific portions of the ISMS • Identify General Safety Requirements to Specific WBS Level • RF, Radiation, oxygen deficiency, and cryogenic hazards are mitigated through training, administrative control and engineering control • Chemical hazard (BCP) are mitigated through training, administrative control and engineering control at collaborating site (JLAB) • Chemical hazard (EP) are mitigated through Fermilab’straining, administrative control and engineering control DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  15. SPX Cryomodules / Cavities Scope and WBSU1.02.01.03 & U1.03.03 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  16. SPX Cryomodules / Cavities Obligation Profile U1.02.01.03 & U1.03.03 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  17. SPX R&D and Production Milestones U1.02.01.03 & U1.03.03 SPX0 Cryomodule SPX Cryomodules DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  18. SPX Cryomodules / Cavities Milestones U1.02.01.03 & U1.03.03 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  19. SPX Cryomodules / Cavities Summary Schedule U1.02.01.03 & U1.03.03 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  20. SPX Cryomodules / Cavities BOE Contingency U1.02.01.03 & U1.03.03 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  21. Work after CD-2 • Complete SPX0 cavity processing and prepare for SPX0 cryomodule assembly • Develop a cavity temperature mapping system for SPX cavity processing and testing • Develop other processing and state of art post processing methods to increase both gradient limit and Q0 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  22. Summary • Deflecting cavity prototypes proof of principle completed • Three Mark-II Cavities are fabricated, processed and being tested for SPX R&D • Prototypes of Helium vessel is completed • Horizontal cavity test is scheduled in December(2012) to verify tuner design • If tuner test shows good performance, its design will be final for SPX cavities • The cost is $17,592k • Niobium Material is $355k. Fabrication is $137k • Cavity unit cost is $61,397.28 • We are ready for CD2 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012