Telescope structure of TA-EUSO. M.Bertaina, F.Borotto, G.Giraudo, M. Marengo INFN Torino. TA-EUSO meeting, Napoli, November 8th 2012. Schedule as of Moscow meeting:. Moscow meeting freeze the design End of June final design ready July order material September delivery
E N D
Telescope structure of TA-EUSO M.Bertaina, F.Borotto, G.Giraudo, M. Marengo INFN Torino TA-EUSO meeting, Napoli, November 8th 2012
Schedule as of Moscow meeting: • Moscow meeting freeze the design • End of June final design ready • July order material • September delivery • October manufacturing • November mounting, prepare wooden box • December ship to Delta OK OK OK OK OK