An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Soft Landings: Design mapping Gary Clark Principal Architect, Atkins

  2. Carbon Critical Design • 100 Week Challenge • Carbon Quantification • Operational CO2 • Embodied CO2 • Construction CO2- ROCC • Water CO2 • Life Cycle Cost- DCSF

  3. Carbon Benchmarking Credibility Gap 80%Reduction Gary Clark with Hopkins Architects and Bennetts Associates

  4. New Campus Glasgow • Vision • Merger of 3 Colleges • £300m Super Campus • 50,000 Students • 70,000m2 • Aspiring to BREEAM Outstanding • 10-20 kgCO2/m2/a aspiration • Soft Landings principles

  5. New Campus Glasgow Process Evaluation/ Operational Review Functional Evaluation/ Review Technical Evaluation/ Strategic Review Scottish Funding Council POE Soft Landings

  6. Client Briefing • Sustainable Champion • BREEAM and EPI targets • Adaptive comfort standards • Future proof specification • Ring-fence funding • Prioritise Efficiency • Split Asset and Operational emissions

  7. Passive Engineering • Orientation • Building Form • Daylight • Fenestration • Solar Shading • Insulation / Air tightness • Thermal mass / Night Cooling • Natural ventilation

  8. Construction • Coordinated Design • Sub-contractor input • Main contractor experience • Mock ups • Benefits of on-site testing • Controls • Commissioning Air-tightness

  9. Conclusion • Appoint experienced team and performance champion • Soft landings at Briefing • Keep it simple • On-site testing • Handover and User Guides • Management and operation • POE and Aftercare The Hub, Aztec West, Bristol

  10. Questions?

  11. Carbon Benchmarking Usable Buildings Trust