Cycle-Based Waste Management in Oslo

Cycle-Based Waste Management in Oslo. A complete solution for a cycle based waste management system in Oslo. Waste-to-Energy Agency (EGE). Agency in the City of Oslo, organized under Department of Environmental Affairs and Transport.

Download Presentation

Cycle-Based Waste Management in Oslo

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cycle-Based Waste Management in Oslo

  2. A complete solution for a cycle based waste management system in Oslo

  3. Waste-to-Energy Agency (EGE) • Agency in the City of Oslo, organized under Department of Environmental Affairs and Transport. • Waste-to-Energy plants located at Haraldrud and Klemetsrud. • EGE recovers 250 000 tons of waste yearly, thereby 130 000 tons of Oslo’s household waste. • Destruction of infectious waste from hospitals, and fractions that demand special treatment. • The energy from our plants is utilised in the district heating net in Oslo and as electric power in the electricity grid. • Producing energy from waste is a socio-economic and environmental favourable way to treat waste that cannot otherwise be recovered.

  4. Political objectives in Oslo • 50 % reduction in emissions of greenhouse gases by 2030. • Plan for residual waste treatment - 2006 – 2009: • 50 % recovery of materials in by 2014. • Source sorting of food waste and plastic packaging by the end of 2011. • Increased use of renewable energy: • Basis for increased use of district heating, 1 - 2 TWh. • Change from fossil fuels to renewable fuels for the district heating system.

  5. Scope of development ”EGE 2010” • Optical sorting plant for food waste and plastic packaging • Biogas factory producing biogas (fuel) and biofertilizer from food waste • A new waste incinerator line

  6. Plan for EGE 2010 Phase Start End Pre-studies 01.09.06 31.03.07Specifications and Contract signing 01.04.07 30.06.08Planning and Building 01.07.08 30.09.10Take over 01.10.10 31.12.10

  7. Source sorting in coloured plastic bags – optical sorting Receipt pocket/transporters Optical sensors

  8. From food waste to biogas and biofertilizer Biogas factory

  9. Biogas factory

  10. Food waste + sewage = biogas

  11. Biogas production – key figures

  12. Waste incineration today: • Key figures for incinerator and boiler: • Capacity: 20 t/h – 160.000 tons/year – 2 waste incinerators (80.000 tons each) • Thermal power: 49 MW • Electric power: 10 MW • Energy delivered (GWh): 2007 • District heating 285 • Electric energy 75 • Total 360 • Produced steam – approx. 370 °C/40 bar • Electric gas motor: 12 GWh

  13. The new waste incinerator • Key figures for waste incinerator and boiler: • Capacity: 20 t/h - 160.000 tons/year • Power: 49 MWt 10MWel • Energy delivered (GWh): 2007 2011 • District heating 285 573 • Electric Energy 75 140 • Total 360 713 • Produced steam – approx. 400 °C/40 bar • Best available technology (BAT)

  14. Haraldrud - before

  15. Haraldrud - after

  16. Klemetsrud – before

  17. Klemetsrud – 30.07.09