Few introductory remarks on topical meetings…. System safety review. Presentation to LNGS SC, Oct 14. Dense schedule of meetings with LNGS and safety experts during last six months
E N D
System safety review Presentation to LNGS SC, Oct 14 • Dense schedule of meetings with LNGS and safety experts during last six months • Various documents and studies performed in collaboration with external experts (TDR, FMECA, HAZOP, TÜV, 2nd opinion, …) • Intense discussions: BSK vs. 3rd wall • Pragmatic conclusion (Sep 5/9 meetings): study of feasibility of 3rd wall in close co-operation with LNGS and implement if ► performance of the experiment not compromised ► within financial capabilities of collaboration • Under study: Cu and Lexan • Safety concept of GERDA accepted by LNGS with implementation of 3rd wall
Discussion within management team after LNGS SC meeting: • Proceed with water tank tender submission to INFN council in October • Organize topical meeting on WT/Cryo-tank & 3rd wall at Tuebingen meeting • Review WT/CT/3rd wall design • Make sure that 3rd wall has no impact on physics performance • Make sure that 3rd wall has no/minimal impact on WT or CT • If flaws of design appear, still in time to fix • If possible, take decision for 3rd wall material/design at this meeting • Move on with maximum speed to start WT and CT construction
Topical meeting on LAr vs. LN • LN design based on our experience of radio purity, liquid/gas handling, supply chain quality control • LAr considered interesting alternative (=1.4 g/cm3, bp: 10 K above LN, scintillator) • Review advantages and disadvantages of LAr and LN Do we have all information needed to make choice? If not, come up with ‘to do list’ Does design of particular hardware need early decision? (e.g. Cryogenic system?) Is change at later time possible/realistic/needed?