1 / 10

Instrumentation; Part 1

Instrumentation; Part 1. Creepmeters (all use LVDT as the displacement sensor) Legacy instruments – 10 to 30 meter Invar wire crossing the fault @ 30 degrees – measure change in distance between two piers

uri
Download Presentation

Instrumentation; Part 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Instrumentation; Part 1 • Creepmeters (all use LVDT as the displacement sensor) • Legacy instruments – 10 to 30 meter Invar wire crossing the fault @ 30 degrees – measure change in distance between two piers • Bilham designed – In SF Bay area (5 sites) uses either carbon fibre or quartz rods; Piers are typically helical piles augured to ~5 to 10 meters depth. From R. Bilham

  2. Instrumentation; Part 2Borehole strain • Dilatometers (first installed in 1980s @ Parkfield); uses lvdt to measure volume change of fluid filled chamber that is ~2 meters long • 5 – Parkfield • 5 – SF Bay • 2 – S. Calif • 4 – Long Valley • GTSM (Legacy or prototype PBO strainmeters) Uses capacitor transducers to measure length change of 4 extensometers – length of each extensometer is ~ few cm; averaging area in borehole a few cm. • 1 – SF Bay • 1 – San Juan Bautista • 1 – S. Calif (???) • 2 – Parkfield – failed • Mini-PBO, 3-component strainmeters; uses 3 vertical chambers each spanning a 120 deg. sector. Otherwise similar to dilatometer • 5 – SF Bay (one not functioning as we are still waiting with UCB to have AC power restored

  3. Instrumentation; Part 2Borehole strain – continued • Simultaneous retirement of personnel from borehole strainmeter project one year ago! • Deformation project in Menlo Park only retained partial expertise

  4. USGS Strain and Creepweb urls: • Locations, data plots and data archive: • http://earthquake.usgs.gov/monitoring/deformation/data/ • http://earthquake.usgs.gov/monitoring/deformation/data/plots/ Low resolution in strain – but does show site locations • http://earthquake.usgs.gov/monitoring/deformation/data/download/ Data archive • High resolution plots of strain data; http://escweb.wr.usgs.gov/share/langbein/Web/USGS_strain/

  5. Locations S.F. Bay San Juan Bautista

  6. Locations Parkfield Southern Calif.

  7. Operations, Part 1: • Only funded to continue operations of Bay Area creep and strain. • Working with NCSN and UCB to upgrade their telemetry to accommodate the borehole strain data (which for the 3-component, mini-PBO includes tilt and pore pressure). Data come in as mini-seed at 100 to 200 sps; raw data available at NCEDC; clean data available at USGS • Once complete, we would remove the low-sample rate, satellite telemetry from these sites. • NCSN and UCB would maintain telemetry (along with co-located seismic equipment) • There is a proposal to upgrade the Parkfield strainmeter sites to continuous, high-rate telemetry • No plans to change creep telemetry from low-sample rate telemetry to higher sample rate • Separate from the telemetry, it is not clear about the future of maintenance to strainmeters – assumption is to operate until the 'die'. How do you define death to a strainmeter? Bad battery??? failure of up-hole electronics? Failure downhole? Where is the expertise?

  8. Operations; part 2 • O & M for central Calif. sites (creep and strain) relies upon having a employee located in Parkfield; that individual also takes care of SAFOD related problems. • O & M for Southern Calif; nothing planned.

  9. Processing and Archiving • Both currently done at USGS Menlo Park • Depends upon availability of Langbein • Could this be transferred to UNAVCO?

  10. 1-month GPS and borehole straincomparison High-rate GPS Daily sampled GPS Assumes 10KM distance between GPS stations Borehole strain 1-day

More Related