1 / 7

The 2013-2014 Experience

The 2013-2014 Experience. 1.98% increase over 2012-2013 budget $64,272,418 approved by Budget Committee $65,020,621 ACTUAL final budget ACTUAL increase: 3.2% Appropriations went up more than anticipated because government revenue was lower than projected. 2013-2014 Experience.

uriah-hale
Download Presentation

The 2013-2014 Experience

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The 2013-2014 Experience • 1.98% increase over 2012-2013 budget • $64,272,418 approved by Budget Committee • $65,020,621 ACTUAL final budget • ACTUAL increase: 3.2% • Appropriations went up more than anticipated because government revenue was lower than projected

  2. 2013-2014 Experience Actual expended figures From 2013 expended to 2014 budget: + 6.4%

  3. 2013-2014 Experience Actual expended figures From 2013 expended to 2014 budget: + 6.4%

  4. 2014-2015 Proposed • If all of 2013-2014 is expended, the proposed budget represents a 5.76% increase • With a $2 million 13/14 surplus, the proposed budget will be 9% higher than 13/14 expended before the effect of warrant articles.

  5. 2014-2015 Proposed • Timberlane's enrollment since 2008: -17.28% • Timberlane's budget since 2008: +22.20% • Change in gross per pupil cost: +33.70% (inflation adjusted) • Gross per pupil cost with proposed budget: $17,865

  6. 2014-2015 Proposed Proposed baseline budget for 14/15: $63,759,060 2014 gross per pupil cost, 2015 forecast enrollment, 1.75% inflation, SAU removed • [($16,570 X 3849) x1.75%] - 1,138,624

  7. 2014-2015 Cost Drivers • Salaries +$1,360,246 ( 20.5 new positions) • Insurance +$875,433 (includes 10 new positions) • Building Projects +$304,940 • Equipment +$293,433 • Tuition +230,510 • Retirement +$195,891 • FICA +$114,391 • Transportation +$184,436 • Professional Services +137,145 • Software/books +113,948

More Related