1 / 5

Evacuation Assembly Points – Main Campus

Evacuation Assembly Points – Main Campus. Main Campus Assembly Points. CP 8/8A. Radcliffe House. Ramphal. CP 4/4A. Heronbank Courtyard. CP 16. CP 5. CP 6. CP 7. CP 10. CP 9. CP 15. Scarman House. Lakeside Courtyard. CP 3. Gibbet Hill Assembly Points. CP 1A.

urit
Download Presentation

Evacuation Assembly Points – Main Campus

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Evacuation Assembly Points – Main Campus

  2. Main Campus Assembly Points CP 8/8A Radcliffe House Ramphal CP 4/4A Heronbank Courtyard CP 16 CP 5 CP 6 CP 7 CP 10 CP 9 CP 15 Scarman House Lakeside Courtyard CP 3

  3. Gibbet Hill Assembly Points CP 1A

  4. Westwood Assembly Points CP 13 CP 14

  5. Version History

More Related