An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How to manage the testing phase of the PSIP(s) Isidoros Passas URENIO

  2. Testing phase In case of STRATINC:A process as well • Definition : Testing is the process of executing a program with the intent of finding errors Glen Myers • Objective explained: Testing is obviously concerned with errors, faults, failures and incidents. A test is the act of exercising software with test cases with an objective of • Finding failure • Demonstrate correct execution Paul Jorgensen

  3. Classification of Test • One classification is based on the following methodologies: • Black box (Functional) Testing: inspects specified behavior • White box (Structural) Testing: inspects programmed behavior

  4. Structural (White box) Test methodologies Functional (Black box)

  5. Presentation methods of the testing phase • The cause-effect graph: • Examine the requirements and restate them as logical relation between inputs and outputs. • The result is a Boolean graph representing the relationships called a cause-effect graph. • The decision table: • each column of the decision table corresponds to a test case for functional testing.

  6. Steps to create cause-effect graph • Study the functional requirements. • Mark and number all causes and effects. • Numbered causes and effects become nodes of the graph. • Draw causes on the LHS • Draw effects on the RHS • Draw logical relationship between causes and effects as edges in the graph. • Extra nodes can be added to simplify the graph

  7. Cause Effect Graph

  8. Decision Table • Two dimensional mapping of condition against actions to be performed • Conditions evaluate to Boolean • Action corresponds to expected activity • They can be derived from Cause Effect graph too • Map cause as condition • Map effect as action

  9. Cause effect graph- Decision table Causes: I=Invoked X=don’t care S=suppressed Effects: P=present A=absent

  10. IEEE Standard 829 - 1998 • Test plan identifier • Introduction • Test Items • Features to be tested • Features not to be tested • Approach • Item pass/fail criteria • Suspension criteria and resumption requirements

  11. The testing phase of the PSIP in Region of Central Macedoniaand the ICT cluster

  12. Testing phase and STRATINC • Two main scopes (a) Test the flow system of Information for the Strategic Intelligence platform (b) Test the functionality of the software Pilot platform • Proposed Methodology White Box for scope (a) Black Box for scope (b)

  13. Proposed testing process of the PSIP in RCM • The Information collection process into the PSIP will be tested based on the white box methodology by a Strategic Intelligent expert from URENIO. • The functions of the installed PSIP will be tested by the 20 companies that answered the questionnaires.

  14. Investigation Watch-Alert Analysis & output Information diffusion Type of watch Technological & scientific Products Market Managerial Supplier/provider Costumer Patents URENIO RCM Requirements

  15. Points that will be assessed during the Usability tests • All aspects of user interfaces are tested: • Display screens • messages • report formats • navigation and selection problems

  16. Test Summary Report • Will be generated towards the end of the testing phase. • It will cover each subsystem: • Information collection process • And a summary of the tests which have been applied to the PSIP.

  17. Testing phase deliverables • Test deliverables • Testing tasks • Responsibilities • Staffing and training needs • Risk and contingencies • Approvals