80 likes | 238 Views
MTS#38 38TD12 : TTCN-3 and MTS-IPT Status Reports. Anthony Wiles. Agenda Item 5.5 TTCN-3 Maintenance. STF 253 extension Had one session (plus Monday this week) Updated CR list (Report Colin Willcock) Need to prioritise ‘ additions ’ list How to make additions ( Packages, profiles etc .)
E N D
MTS#38 38TD12 : TTCN-3 and MTS-IPT Status Reports Anthony Wiles
Agenda Item 5.5TTCN-3 Maintenance • STF 253 extension • Had one session (plus Monday this week) • Updated CR list (Report Colin Willcock) • Need to prioritise ‘additions’ list • How to make additions (Packages, profiles etc.) • Extended communication mechanisms • More flexible handling of test data • Extensions on parameters • Extended import mechanisms • Test configuration / test architecture • Real-time extensions • Performance testing support • External language support • Extended logging support • Extended type systems
Agenda Item 5.6TSS&TPs for SIGTRAN (SCTP, M3UA) • No STF, entirely voluntary • MTS-0086 SCTP • Version 0.0.3 on latest drafts • Liaison from TISPAN • General TISPAN comments • Technical comments (mostly resolved or being resolved) • Approval? • MTS-0087 M3UA • Version 0.0.2 on latest drafts • Received comments from TISPAN (no liaison to MTS#38) • General TISPAN comments • Technical comments (mostly resolved or being resolved) • Approval? • Should assign a new rapporteur/caretaker for these WIs
Agenda Item 5.6 TSS&TP SIGTRAN (M2UA) • New STF 269 • Based on test specifications input by HSS • Have received sample tests • Rate we can progress will depend on Hughes • Preparatory meeting held • Peter Schmitting (leader) • Francois Fischer • Initial workplan available • First session (soon) will concentrate on analysing received material and synchronising with Hughes
Agenda Item 5.6VoIP Test Specifications • New STF 270 • Maintenance of SIP, H.225 and H.248 test specs. • PICS, TSS&TP, TTCN (2/3) • Mostly TTCN and consistency TPs:TTCN • Most effort need on SIP • Preparatory meeting held • SIP: Francois Fischer (leader) • H.225: Peter Schmitting • H.248 (SIP): Csaba Koppany • Initial workplan available • First session will concentrate on collecting comments etc. Maybe put a CR mechanism in place.
Agenda Item 5.7IPv6 Test Specifications • STF 256: TTCN-3 Toolbox (initial design/analysis) • Dec 2003 – June 2004 • Precursor to ‘full’ IPv6 project • Analysis of existing test specifications (TAHI, UNH) • Skeleton document • Methodology (interop aspects) • TP language (presentation by Steve) • Style and naming conventions • Synchronisation (of PTCs – looked at TSP.1 plus) • Architectures (need for Upper Tester) • Library structure • Where should the library reside? • Actual TTCN-3 code
Agenda Item 6.1Workplan for eEurope IPv6 • Initial workplan done • Detailed workplan in progress • Voluntary resource • Project roles and responsibilities • IPv6 Ready group – contact person (within the STF) • Will use as much existing material as possible • IPv6 Ready group • From UNH, TAHI • Methodology deviates from ETSI • Need to write PICS • Need to rework TPs according to ETSI style (new language?) • Will correct (break up) TPs and write new ones if necessary • Will write TTCN-3 • Conformance and Interoperability